From Utah Discovery Shock — Connor Hill | Insightful Word <[email protected]>
Subject What Emerged From The Utah Ground Caught Everyone Off Guard
Date October 8, 2026 6:44 AM
  Links have been removed from this email. Learn more in the FAQ.
  Links have been removed from this email. Learn more in the FAQ.
A drilling crew working deep beneath Utah uncovered something that stopped
people cold.‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎
‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎
‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎
‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎
‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎
‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎
‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎



<[link removed]>

October 08


 



Utah Discovery Shock

Find Out More →
<[link removed]>






Hi, I’m Dylan Jovine.

A drilling crew working deep beneath Utah uncovered something that stopped
people cold.
<[link removed]>

<[link removed]>
Since then, word of the Beaver County find has spread quickly.

Some now believe its impact could be far bigger than anyone first imagined.
See what the crew brought to the surface >>>
<[link removed]>


 





Energy Briefing · The Hill Report
Geothermal Kept Its Federal Credit After Wind and Solar Lost Theirs
The 2025 tax law cut off two technologies at the end of 2027 and left
geothermal on a schedule that runs to 2035 — a difference written into one
subsection of the code. Connor Hill · InsightfulWord · October 08
Key points

The clean electricity credits in sections 45Y and 48E now end for wind and
solar facilitiesplaced in service after December 31, 2027. Geothermal is not
subject to that cutoff.

For other technologies, including geothermal, the statute sets a phase-down
keyed to when construction begins: full credit through2033, then 75% in 2034,
50% in 2035 and nothing after.

A geothermal plant in Beaver County, Utah declared commercial operation on
September 30, with its first unit producing 33 megawatts net.

Utility contracts for that plant's later phases were approved by California's
utility regulator by resolution, raising the contracted total from320 to 398
megawatts in June 2025.
Beaver County, Utah has become the place where a technology moves from test
wells to a grid connection. Whatever was brought to the surface there, the
economics of turning heat into electricity in the United States now rest on a
short passage of the tax code that treats geothermal very differently from wind
and solar.

That passage, and the regulatory approvals that sit beside it, are public,
dated and specific. They are the part of the story that can be checked line by
line.

On the tape
Oct 1Fervo Energy said its Cape Station in Beaver County synchronized to the
grid on September 24 and declared commercial operation on September 30, one day
before the contractual date.Why it matters: the first unit produces 33
megawatts net; two more 33-megawatt units are due by January 1, 2027, and a
second phase of 400 megawatts is scheduled for 2028.
Oct 5California's Imperial Irrigation District signed ten-year agreements for
86 megawatts of geothermal power from two existing Salton Sea plants, with
deliveries starting January 1, 2027.Why it matters: the price was not
disclosed, which is typical — contract volumes and terms are announced, and
pricing usually appears only in regulatory filings.
Oct 1A Salton Sea geothermal and lithium developer and its special-purpose
acquisition partner said about $245 million of convertible notes would be
restructured, roughly $205 million converting to equity.Why it matters: the
planned project is about 650 megawatts, with a first stage of 50 megawatts
targeted for 2028, so the financing precedes the generation by years.
Oct 5A federal geothermal lease sale in Idaho was reported for November 17,
covering about 113,330 acres, after sales already scheduled in Nevada on
October 20 for 265,691 acres and in California on October 27.Why it matters:
federal lease sales publish parcel counts, acreage and winning bids, the only
public price signal for geothermal land — the last completed sale, in New
Mexico in June, drew $16.6 million for about 152,000 acres.

What the 2025 Law Changed, and for Whom
The One Big Beautiful Bill Act, signed in July 2025, rewrote the phase-out of
the two technology-neutral clean electricity credits — the production credit in
section 45Y and the investment credit in section 48E. It did so with two
separate mechanisms that are easy to conflate.

The first is a hard stop for two technologies. Section 45Y(d)(4) now provides
that the credit "shall not apply with respect to any applicable facility placed
in service after December 31, 2027," and defines an applicable facility as one
using wind or solar energy. Section 48E carries a parallel termination for wind
and solar property. A transition rule protects projects that began construction
within twelve months of enactment.

The second is a phase-down for everything else. The statute sets an
"applicable year" of 2032 and reduces the credit according to when construction
begins: 100% in the first year after that, 75% in the second, 50% in the third,
and zero thereafter. For a geothermal plant that means full credit for
construction beginning by the end of 2033, 75% in 2034, 50% in 2035, and no
credit for construction starting in 2036 or later. Law-firm timelines read the
statute the same way, adding that a four-year continuity safe harbor can carry
a 2033 start to a 2037 in-service date.

The practical result is a decade-wide gap. A wind farm that is not in service
by the end of 2027 loses the credit; a geothermal plant that starts
construction in 2033 keeps all of it.

By the numbers
Dec 31, 2027Placed-in-service cutoff for wind and solar under 45Y and 48E
2033Last year geothermal construction can begin with the full credit
75% · 50%Credit available for construction beginning in 2034 and 2035
33 MWNet output of the first unit at Cape Station, operating from September 30
398 MWContracted capacity after California's June 2025 amendment approval
265,691Acres offered in the Nevada geothermal lease sale on October 20

The Conditions That Still Apply
Keeping the credit is not the same as receiving it automatically. Two sets of
conditions added in 2025 apply to geothermal as they do to other technologies.

The first concerns foreign entities. A facility whose construction begins
after December 31, 2025 is excluded if it includes "any material assistance
from a prohibited foreign entity," and the investment credit is denied outright
to a taxpayer that is a specified foreign entity. The material-assistance test
is measured as a cost ratio that rises each year, from 40% in 2026 to 60% from
2030, according to an industry summary of the interim guidance. Treasury issued
interim rules in February and is due to publish new tables by the end of this
year.

The second concerns when construction is deemed to begin. In August 2025 the
tax agency tightened that test for wind and solar alone, removing the
long-standing 5% cost safe harbor for most of them and leaving only a
physical-work test. The notice does not mention geothermal. Its scope,
confirmed in law-firm commentary, is limited to the two technologies the
statute singled out.

What none of this does is guarantee a project's economics. A credit reduces
tax owed on electricity produced or capital invested. It does not supply a
buyer, a transmission line or a permit.

📊 Fresh Energy Signal33 MW
The net output of the first generating unit at Cape Station in Beaver County,
which declared commercial operation on September 30 after 23 months of
construction. Two more units of the same size are due by January 1, 2027, and a
further 400 megawatts in 2028. It is the first commercial unit of its kind in
the county, and it began producing under the credit schedule described above.


How a Utility Contract Gets Approved
Electricity from a new plant needs a buyer, and for a regulated utility the
buyer's contract needs a regulator's approval. California's process shows how
that works on the public record.

The utility files an advice letter with the state Public Utilities Commission
describing the contract, and the commission's energy division resolves it at a
public meeting. For the Beaver County plant, Southern California Edison filed
in January 2024 for two contracts totaling 320 megawatts. In April 2025 it
filed amendments, and on June 26, 2025 the commission adopted Resolution E-5404
approving them: one unit at 62 megawatts of nameplate capacity, 58 of them
counted toward the utility's reliability requirement, and another at 336
megawatts, 310 counted. The amendments raised the total to 398 megawatts.

Two details in that resolution repay attention. Nameplate and counted capacity
are reported separately, because a regulator credits only the share it expects
to be available when needed. And the resolution is dated and numbered, which
makes it the fixed point against which any later claim about contracted volume
can be checked. Public statements since then describe more than a gigawatt
under contract across several buyers; the commission's resolution covers the
part a regulator has approved.

Where the terms are written
Internal Revenue Code, section 45Y(d)Wind and solar cutoff after 2027;
phase-down for other technologiesApplicable year 2032; zero for construction
starting in 2036
Internal Revenue Code, section 48EParallel investment credit structure and
foreign-entity limitsTaxpayer-level exclusion for specified foreign entities
Tax agency Notice 2025-42Beginning-of-construction rules tightened for wind
and solarDoes not address geothermal
California Public Utilities CommissionResolution E-5404 approving contract
amendmentsAdopted June 26, 2025; 320 to 398 megawatts
One question for the desk
When a new energy discovery is announced, is it the resource itself or the tax
and contract terms around it that decides whether it gets built?

Hit reply — one line is enough.

Worth stating plainly
The 2025 tax law ended the clean electricity credits for wind and solar
facilities placed in service after 2027 and left geothermal on a separate
schedule: full credit for construction starting through 2033, then 75%, then
50%. The first commercial unit in Beaver County began operating on September 30
under contracts a state regulator approved by numbered resolution.

The short checklist
1.Separate the two 2025 mechanisms: a 2027 placed-in-service cutoff for wind
and solar, and a construction-start phase-down for everything else.
2.For any geothermal project, note when construction began; that date sets the
credit percentage.
3.Check the foreign-entity conditions for any project starting construction
after 2025.
4.Look for the regulator's resolution behind a utility contract, and read
nameplate and counted capacity separately.
5.Treat announced contract totals as statements until a filing or resolution
confirms them.


Replies to this briefing reach a person, not a queue.

Connor Hill reads every reply.

Sources checked Verified October 07, 2026 Title 26, United States Code,
sections 45Y and 48E, as amended by Public Law 119-21 Internal Revenue Service
Notices 2025-42 and 2026-15 California Public Utilities Commission Resolution
E-5404, adopted June 26, 2025 Fervo Energy release on commercial operation at
Cape Station, October 1, 2026 ThinkGeoEnergy and Renewable Energy Magazine
reports on the Imperial Irrigation District agreements, October 5 and 6, 2026
Bureau of Land Management geothermal lease sale notices for Nevada, California
and Idaho, 2026 Connor Hill writes The Hill Report for InsightfulWord, a daily
briefing on the machinery behind the numbers.



Insightful Word (IW) is a daily publication of TerraTrance Technologies, LLC.



We'd love to hear from you. Reply to this email with any question, or write to
us [email protected] <mailto:[email protected]>



TerraTrance Technologies, LLC. This email may not be reproduced or distributed
without prior written consent.

200 Broadway Blvd NE, Albuquerque, NM 87102

Privacy Policy <[link removed]>
Terms & Conditions <[link removed]>
Unsubscribe
<[link removed]>



© 2026 Insightful Word (IW) · Thank you for reading.

Message Analysis