From Wyoming Department of Environmental Quality <[email protected]>
Subject Public Notice: Public Meeting, City of Gillette, WY, 30” Madison Pipeline Repair Project
Date August 5, 2025 2:01 PM
  Links have been removed from this email. Learn more in the FAQ.
  Links have been removed from this email. Learn more in the FAQ.
Wyoming Department of Environmental Quality  | view as a webpage [ [link removed] ]

header new 2
Notice of Public Meeting, City of Gillette, WY, 30” Madison Pipeline Repair Project

The City of Gillette, Wyoming, will conduct a public meeting at 12:00 p.m., local time, on August 20th, 2025, at City Hall, 2nd Floor Engineering Conference Room, 201 E 5th Street, Gillette, Wyoming. The purpose of the meeting is to allow citizens to review and comment on the following project: 30” Madison Pipeline Repair.

At the meeting, the City of Gillette will present the design of the proposed project and will discuss the estimated cost of the improvements and the plan for funding the improvements. A preliminary plan of improvements, cost estimates, and funding plan can also be reviewed at HDR, Inc., 601 Metz Drive. Contact Justin Stark, P.E. at 307-228-6009.

The City of Gillette initially secured a $10 Million loan from the Wyoming Drinking Water State Revolving Loan Fund. Based on current cost estimates the City plans to borrow and additional $2.5 million from the Wyoming Drinking Water State Revolving fund administered by the Wyoming Office of State Lands and Investments. Current user fees will repay the loan. The average rate of the current fees is estimated to be $0.31/Month per user to repay the additional $2.5 million added to the original loan. Loan terms will be 0% interest rate and 20 years.

Written comments are also welcome. Send written comments to Clark Sanders, Senior Project Manager, 201 E. 5th Street, Gillette, Wyoming 82716, *[email protected]*. Comments are due by 5:00 p.m. August 20th, 2025

*Para español, visite deq.wyoming.gov [ [link removed] ]*. "Americans with Disabilities Act: special assistance or alternative formats will be made available upon request for individuals with disabilities. Please provide at least fourteen (14) days before the close of the public comment period for such requests."


________________________________________________________________________



View in Español [ [link removed] ]

DEQ [ [link removed] ]
                        Hot New Topic:

     State of the Environment - DEQ's Podcast [ [link removed] ]




View in Spanish [ [link removed] ]

stay connected:

Facebook [ [link removed] ]  Twitter [ [link removed] ]  LinkedIn [ [link removed] ]  Instagram [ [link removed] ]  Youtube [ [link removed] ]

unsubscribe [ [link removed] ]  |  manage preferences [ [link removed] ]  |  help [ [link removed] ]

________________________________________________________________________

This email was sent to [email protected] using GovDelivery Communications Cloud on behalf of: Wyoming Department of Environmental Quality · 200 West 17th St.· Cheyenne, WY 82002 GovDelivery logo [ [link removed] ]
body .abe-column-block { min-height: 5px; } table.gd_combo_table img {margin-left:10px; margin-right:10px;} table.gd_combo_table div.govd_image_display img, table.gd_combo_table td.gd_combo_image_cell img {margin-left:0px; margin-right:0px;} table.govd_hr {min-width: 100%;} p, li, h1, h2, h3 { overflow-wrap: normal; word-wrap: normal; word-break: keep-all; -moz-hyphens: none; -ms-hyphens: none; -webkit-hyphens: none; hyphens: none; mso-hyphenate: none; }
Screenshot of the email generated on import

Message Analysis