From Wyoming Department of Environmental Quality <[email protected]>
Subject Public Notice: Public Meeting, Town of Clearmont, WY, Town of Clearmont Water Main Replacement: Phase I Meade Ave.
Date May 10, 2025 2:00 PM
  Links have been removed from this email. Learn more in the FAQ.
  Links have been removed from this email. Learn more in the FAQ.
Wyoming Department of Environmental Quality  | view as a webpage [ [link removed] ]

header new 2
Notice of Public Meeting, Town of Clearmont, WY, Town of Clearmont Water Main Replacement: Phase I Meade Ave

The Town of Clearmont, Clearmont Wyoming, will conduct a public meeting at 6:00 pm MDT, local time, on Tuesday May 27th, 2025, in the Town Hall of Clearmont, 1605 Pennsylvania Ave, Clearmont, WY 82835. The purpose of the meeting is to allow citizens to review and comment on the following project: Town of Clearmont Water Main Replacement: Phase I Meade Ave. The Town of Clearmont who owns their own water system, needs to continue replacing and improving our DIP waterline/distribution lines that were installed in 1980-1983. Meade Ave is a high priority for our community due to a WYDOT project scheduled for summer of 2026. We would like to replace the distribution/waterline prior to the US HWY 14-16 mill and overlay project funded by WYDOT.

At the meeting, the Town of Clearmont will present the preliminary design of the proposed project and will discuss the estimated cost of the improvements and the plan for funding the improvements. A preliminary plan of improvements, cost estimates, and the funding plan can also be reviewed at Clearmont Town Hall, 1605 Pennsylvania Ave, Clearmont WY. Contact Town Clerk, Kirstie Auzqui at (307) 758-4465.

Based on current cost estimates, the Town of Clearmont plans to borrow $1,201,690.00 from the Wyoming Drinking Water State Revolving Loan Fund administered by the Wyoming Office of State Lands and Investments. Sheridan County Capital Facility Tax and increased user fees will repay the loan. The average water rate increase is estimated to be 8% per calendar year to help repay the loan. Loan terms will be 0.5% interest rate, with 67% principal forgiveness ($805,132.30) and a 30-year repayment term for the remaining 33% ($396,557.70). This project may qualify as an Equivalency project in conjunction with the WYDOT Highway project, therefore changing our interest rate to 0%.

Written comments are also welcome. Send written comments to Town of Clearmont, c/o Town Clerk, PO Box 127, Clearmont WY 82835 or by email:* [email protected]* by Tuesday, May 27th at 4:00 PM MST.

*Para español, visite deq.wyoming.gov [ [link removed] ]*. "Americans with Disabilities Act: special assistance or alternative formats will be made available upon request for individuals with disabilities. Please provide at least fourteen (14) days before the close of the public comment period for such requests."


________________________________________________________________________



View in Español [ [link removed] ]

DEQ [ [link removed] ]
                        Hot New Topic:

     State of the Environment - DEQ's Podcast [ [link removed] ]




View in Spanish [ [link removed] ]

stay connected:

Facebook [ [link removed] ]  Twitter [ [link removed] ]  LinkedIn [ [link removed] ]  Instagram [ [link removed] ]  Youtube [ [link removed] ]

unsubscribe [ [link removed] ]  |  manage preferences [ [link removed] ]  |  help [ [link removed] ]

________________________________________________________________________

This email was sent to [email protected] using GovDelivery Communications Cloud on behalf of: Wyoming Department of Environmental Quality · 200 West 17th St.· Cheyenne, WY 82002 GovDelivery logo [ [link removed] ]
body .abe-column-block { min-height: 5px; } table.gd_combo_table img {margin-left:10px; margin-right:10px;} table.gd_combo_table div.govd_image_display img, table.gd_combo_table td.gd_combo_image_cell img {margin-left:0px; margin-right:0px;} table.govd_hr {min-width: 100%;} p, li, h1, h2, h3 { overflow-wrap: normal; word-wrap: normal; word-break: keep-all; -moz-hyphens: none; -ms-hyphens: none; -webkit-hyphens: none; hyphens: none; mso-hyphenate: none; }
Screenshot of the email generated on import

Message Analysis