DNR News Release Header Image [ [link removed] ]
*FOR IMMEDIATE RELEASE:?*Dec. 20, 2022
*Contact:?*Greg Pils, DNR Director of Environmental Analysis and Sustainability
[email protected]?or 608-301-6264
Certificate Of Completion Of Reclamation Issued To Flambeau Mining Company
?
* MADISON, Wis.*?? The Wisconsin Department of Natural Resources (DNR) today issued a Certificate of Completion of Reclamation to Flambeau Mining for the industrial outlot portion of its mining site near Ladysmith in Rusk County. The DNR also issued a Revised Mining Permit to the company.
Flambeau Mining Company?was issued a mining permit and other necessary permits to operate an open pit copper mine in early 1991. Ore shipments from the mining site began in 1993 and continued for more than four years. Site reclamation, including backfilling of the pit, was substantially completed by the end of 1999. Flambeau Mining Company was later issued a Certificate of Completion of Reclamation for 149 acres of the 181-acre mining site in 2007. The remaining 32 acres, referred to as the industrial outlot, includes an area for which the original reclamation plan was modified to allow alternate uses of the project buildings and adjacent areas. The site currently includes a DNR Service Center, Xcel Energy's power line maintenance shop and an equestrian trailhead.
Flambeau Mining Company submitted a petition to the DNR requesting issuance of a Certificate of Completion of Reclamation for the industrial outlot portion of the mining site. The DNR made a preliminary determination that Flambeau Mining Company has met its obligations under the approved reclamation plan, as modified in 1998. The DNR solicited and received public comments on that preliminary determination as well as a draft Revised Mining Permit.
After consideration of public comments, the DNR determined that Flambeau Mining Company met its obligations under the approved reclamation plan, as modified in 1998, and that the Certificate of Completion of Reclamation covering the industrial outlot portion of the mining site should be issued in accordance with applicable laws and rules. With issuance of the Certificate of Completion of Reclamation for the industrial outlot, reclamation of the entire mining site has been certified as complete.
The DNR also issued a Revised Mining Permit which delineates the ongoing obligations of Flambeau Mining Company including site monitoring and maintenance, surface water management, compliance with applicable groundwater standards, annual reporting, and financial assurance requirements. The DNR considered the public comments received during a public comment period earlier this year and the information in the DNR files on the reclaimed Flambeau Mine project to develop the conditions in the Revised Mining Permit. The Revised Mining Permit will remain in force until the remaining reclamation bond is released, which will not occur for a minimum of 20 years.
In response to public concerns regarding the water quality of Stream C, an intermittent stream that traverses a portion of the former mining site, DNR and Flambeau Mining Company have agreed that additional assessment of the biologic condition of Stream C is appropriate to determine whether Stream C is attaining its designated uses. Flambeau Mining Company will develop a work plan for the study consistent with all applicable DNR rules and guidance and submit it to DNR, for review and approval in early 2023. The Department anticipates the company will initiate assessment activities in 2023 and that all critical aspects of the work, including sample collection and analysis, will be verified by DNR. The DNR will determine what, if any, additional monitoring or other actions are needed once the study is completed.
The DNR decision documents pertaining to the Certificate of Completion of Reclamation, the Revised Mining Permit and the DNR Comment Summary and Response document are available on?the DNR?s Reclaimed Flambeau Mine webpage [ [link removed] ].
________________________________________________________________________
[ [link removed] ]
[ [link removed] ]
[ [link removed] ]? ? [ [link removed] ]? ? [ [link removed] ]? ?? [ [link removed] ]? [ [link removed] ]
[ [link removed] ] Thank you for your patience as we go through COVID-19 together.?Update your subscriptions, modify your password or email address, or stop subscriptions at any time on your Subscriber Preferences Page [ [link removed] ]. You will need to use your email address to log in. If you have questions or problems with the subscription service, please visit subscriberhelp.govdelivery.com [ [link removed] ].
________________________________________________________________________
This email was sent to
[email protected] using GovDelivery Communications Cloud on behalf of: Wisconsin Department of Natural Resources ? 101 S. Webster Street?? Madison, WI 53707-7921?? 608-266-2621 GovDelivery logo [ [link removed] ]