Let the greens live without diesel for a week and see how that goes.
Bloomberg (11/14/22) reports: "Next month, Tesla Inc. plans to deliver the first of its electric Semi trucks—able to haul a full 40 ton-load some 500 miles on a single charge. These massive batteries-on-wheels may accelerate the transition to electrified transport, but those responsible for delivering the power are starting to ask: Are we ready for this? Probably not, according to a sweeping new study of highway charging requirements conducted by utility company National Grid Plc. Researchers found that by 2030, electrifying a typical highway gas station will require as much power as a professional sports stadium—and that’s mostly just for electrified passenger vehicles. As more electric trucks hit the road, the projected power needs for a big truck stop by 2035 will equal that of a small town. Even the authors who planned the study were caught off guard by how quickly highway power demands will change. A connection to the grid that can handle more than 5 megawatts takes up to eight years to build, at a cost tens of millions of dollars. If power upgrades don’t start soon, the transition to electric vehicles—let alone electric trucks—will quickly be constrained by a grid unprepared for the demand, warned Bart Franey, vice president of clean energy development at National Grid.."
|
|
|
|
|
"Believe what you see, and what is actually happening in the marketplace, not what you hear. Germany and California show that 'alternative' energy is really just 'supplemental' energy."
– Jude Clemente, RealClearEnergy
|
|
|
|
|
|