RE: Remove Construction #48, #72, #115, #217, and #231, 2022 #48-2022, LOADS RESTRICTED TO 11 FEET WIDE ON US-23 FROM HURON AVE TO I-75 CHEBOYGAN/EMMET CO. (EFF. 4/11/2022)(REV. 6/22/22) #72-2022 11FT WIDEON US-45 FROM BOND FALLS RD TO SLEEPY HOLLOW RD IN PAULDING, ONTONAGON CO (EFF 04/13/2022) #115-2022 -13 FT WIDE ON M-64 BRIDGE OVER HALFWAY CREEK FROM WAGNER RD TO HIBBLEN RD, ONTONAGON CO (EFF 05/12/2022) #217 '22 RESTRICTS LOADS TO 10' WIDE ON US-31 /M-72 FROM HOLIDAY RD. TO BUNKER HILL, (EFF 9/6/22) #231 '22 LOADS RESTRICTED TO 14' WIDE & 13'6" HEIGHT ON I-75 NB FROM LEVERING RD. (EXIT 326) TO US-31 (EXIT 336), (EFF. 9/6/22) Construction Restrictions: https://mdotjboss.state.mi.us/APSWB/APBHome.htm?bulletin=active
|