Travel update in Nottingham 23 December - 7 January
Merry Christmas and happy new year!
From all at Transport Nottingham, we wish you a merry Christmas and a happy new year!
At the time of sending there are no travel restrictions in place in England, but please check the Government website for updates throughout the festive period.
Bus and tram festive timetables
Check operator websites for the latest timetable information, along with opening times for call centres and travel centres:
Travelling to Covid vaccination centres
There are lots of options to help you get to a Covid vaccination centre, and you can find them all in one place on our website.
You can take the tram directly to The Forest, and both Richard Herrod Centre and the Victoria Health Centre are well served by buses.
If you, or someone you know, has difficulty using the main bus and tram network, they may be able to use the Easylink service.
Concessionary card holders can travel for free at the following times:
- Mobility: 24/7
- Senior: 9.30am-11pm Mon-Fri, and all day at weekends and bank holidays
Please remember to wear your face covering when using public transport.
A look back at transport in 2021
As we near the end of another year, we've taken a look back at some of the transport highlights and progress made on a number of exciting projects that will make travelling around the city easier.
Have your say
There's just over a week left to tell us what you think about electric vehicles. We're running two surveys until 31 December 2021.
Take this one if you use an electric vehicle, or this one if you don't - we still want to hear from you.
Your responses will help to shape our future work in this area, and everyone who takes part can enter into a prize draw for a £50 shopping voucher.
Walking and cycling
Derby Road
Works start on 4 January on Derby Road, between Lenton Boulevard and Balfour Road. The scheme will include converting two existing crossings to Toucan crossings, and creating one new Toucan crossing, as well as widening three central refuges to make crossing the road easier. View more information here.
Hucknall Road
Also on 4 January, work will begin on the next phase of the Hucknall Road scheme, which will improve the route for people walking, cycling or using the bus. Work will take place on the southernmost, inbound section of Hucknall Road, close to the Valley Road roundabout. For more information visit the webpage.
City centre cycle routes - Canal Street
The next phase of this project to make cycling through the city centre easier will begin in early January, between Trent Street and London Road island. Temporary shared use cycle and pedestrian walkways and bus stops will be provided during works. View more information here.
Victoria Embankment consultation
We're currently consulting on the proposed designs and locations for gates, bollards, and signs to enforce the permanent closure to through traffic. Find out more and have your say by Wednesday 12 January.
Public transport
Rail services 🚆
East Midlands Railway (EMR): EMR will be reinstating services in two stages; first stage from Monday 13 December and then the second from Monday 3 January. Further details can be found on EMR's website.
CrossCountry: Due to train crew availability, there will be disruption to services from Monday 29 November until further notice. Check CrossCountry's website for the latest information.
Northern Rail: Northern Rail is operating several amended timetables due to the impact of Covid on the availability of traincrew, as well as major engineering works. Check your journey here.
Bulwell Bus Station 🚌
We’re proposing improvements to Bulwell Bus Station to make using public transport even easier. Funded by a grant from the Government's Transforming Cities Fund, the plans include a better waiting environment, and a new, centralised saw-tooth arrangement for buses. Find out more and have your say.
Staying safe
In line with latest government guidance, face coverings are required on public transport. Please wear a face covering (unless exempt). If you need to travel, follow the safer travel guidance.
Please check with your local operator before travelling for the latest information.
All operators in the city continue to clean vehicles thoroughly on a regular basis, and windows on buses will be kept open for ventilation.
- Use contactless payment methods where possible
- Keep wearing a face covering
- Carry hand sanitizer with you to use regularly
- Plan ahead - avoid peak hours and routes
Roadworks
Saturday 11 December - until further notice: Sellers Wood Drive at the Junction with Coventry Road Emergency road closure and two way signals for Cadent Gas works
Monday 20 December - Friday 31 December: Meadow Lane junction with Colwick Road and Sneinton Hermitage Multi-way temporary signals while Cadent Gas respond to a gas leak
Monday 3 January - Friday 7 January: New Road junction with Midland Way Three way lights to lay ducting in the footway and carriageway, from 8am to 5pm each day
Tuesday 4 January - Wednesday 5 January: Honiton Road junction with Helston Drive Three way lights to clear blockage in the carriageway
Wednesday 5 January: Nottingham Road Two way lights while work is carried out on overhead structure, between 9.30am and 2pm.
Wednesday 5 January - Thursday 6 January: Helston Drive junction with Strelley Road Three way lights to clear blockage in the carriageway
Thursday 6 January -Friday 7 January: Woodside Road junction of Broadgate roundabout Lane closure for telecoms works from 8am to 6pm each day
Thursday 6 January - Monday 10 January: Bentinck Road Lane closure to enable gas connections
Friday 7 January: Trowell Road near the junction with Birchwood Road Lane closure for traffic signal works from 9.30am until 12pm.
Ongoing roadworks
Friday 23 July - Friday 22 July 2022: High Cross Street (city centre) Road closure between Heathcoat Street and Western Street due to demolition works.
Monday 20 September - Spring 2022: Hucknall Road Suspended bus lane for construction of new cycle route. No stopping between Tring Vale and Heathfield Road. For more information visit our webpage.
Severn Trent Water replacement scheme
Severn Trent will be undertaking a scheme to replace water mains on various roads in the Forest Fields area from July 2021. This will include rolling road closures and parking suspensions in 100m sections to excavate and install new water mains in the highway..
25 November - 11 January: Ewart Road Road closure at the junction of Gladstone Street to the junction of Laurie Avenue.
12 December - 21 January: Austen Avenue Road closure at the junction Gladstone Street to the junction of Laurie Avenue.
12 January 2022 - 23 February 2022: Berridge Road Central Road closure at the junction of Radford Road to the junction of Harcourt Road.
12 January 2022 - 23 February 2022: Berridge Road East Road closure at the junction of Exeter Road to the junction of Harcourt Road.
24 January 2022 - 11 March 2022: Gregory Boulevard Road closure at the junction of Premiere Road to the junction of Radford Road.
24 February 2022 - 2 March: Tissington Road Road closure at the junction of Stanley Road to the junction of Harcourt Road.
14 March 2022 - 23 March 2022: Noel Street Road closure at the junction of Gregory Boulevard to the junction of Bentinck Road and Mount Hooton Road.
|