City of Auburn, Maine. 

NEWS FROM AUBURN, MAINE

CUSTOMER IMPACTING SEWER LINING

An important message from the Auburn Sewerage District:


Next week, the Auburn Sewerage District is beginning a project to re-line the sewer system for better flow, and a more structurally sound pipe. The schedule is posted below and there are a few major considerations:


During this period your property’s sewer service connection will be completely sealed off from the District's main in the street. Please limit the use of water going down your drains to an absolute minimum and DO NOT USE WASHING MACHINES OR DISWASHERS DURING THE INSTALLATION PROCESS. If you must shower, bath, or wash hands please leave the water in the tub/sink until your service has been restored.


Any sump pumps connected to the sewer system must be disconnected and/or discharged elsewhere to avoid possible damage to our liner, or backups in your basement. Failure to follow these instructions may cause your discharge to backup into your property.


The schedule for the lining is posted below. Thank you so much for your patience while the Auburn Sewerage District makes this significant upgrade to our infrastructure!


8/11/2025 FOURTH STREET

8/11/2025 BROAD STREET

8/12/2025 MARIAN DRIVE

8/12/2025 COOK STREET

8/13/2025 DUNN STREET

8/13/2025 GRANITE STREET

8/13/2025 LORING AVE


Facebook  Twitter  YouTube

City of Auburn

60 Court Street

Auburn, Maine 04210

(207) 333-6601