EQB publishes environmental review notices provided by responsible governmental units. For more information on a project undergoing environmental review, click on the individual project links below. You can also find information about active projects in your community on the Environmental Review Projects Interactive Map [ [link removed] ].
3M Oakdale Surface Water Diversion Project [ [link removed] ]
*Location (city/township; county): *Oakdale; Washington
*Process: *EAW
*Step: *EIS need decision
**Responsible governmental unit decision: **Negative (no EIS ordered)
*Responsible governmental unit record of decision date: *July 18, 2025
*Project description: *3M Chemical Operations is proposing a project to collect surface water upstream of the Abresch Disposal Site, to reduce polyfluoroalkyl substances in stormwater discharge from the site. The Abresch Site is the largest of three former disposal sites that comprise the Oakdale Disposal Site, a state and federal superfund site. The project is proposed to further reduce PFAS impacts to stormwater discharge from the site. The proposed project would collect surface water upstream of the site and divert it in a 0.74-mile-long surface water conveyance pipe to a three-acre flood retention basin, where water would then be re-introduced into the natural flow of the watershed. The conveyance pipe would bypass the Abresch Disposal Site, thus bypassing PFAS detected within the site. This would reduce the discharge of PFAS in surface water and improve downstream surface water quality in the Twin Cities east metropolitan area.
3M Oakdale Surface Water Diversion Project project link provided by RGU [ [link removed] ]
*Location of public documents:* DNR, 500 Lafayette Road N, Saint Paul, MN 55155
*Responsible governmental unit and contact: *Minnesota Department of Natural Resources, Becky Horton <
[email protected]>, 651-259-5122
CSAH 6 Grade Raise Project [ [link removed] ]
*Location (city/township; county): *Parkers Prairie Township; Otter Tail
*Process: *EAW
*Step: *EIS need decision
**Responsible governmental unit decision: **Negative (no EIS ordered)
*Responsible governmental unit record of decision date: *July 22, 2025
*Project description: *Otter Tail County is proposing to increase the grade of CSAH 6 as it crosses Nelson Lake near Parkers Prairie in Otter Tail County, MN. Nelson Lake water levels have risen and remained high for several years resulting in overtopping CSAH 6. The flooding has been extensive enough to result in road closures for public safety. The road will be designed to prevent flooding of CSAH 6 that causes infrastructure damage, road closures, and public safety problems while meeting current design standards and requirements. The grade raise that is proposed ranges between 1 and 3 feet from top of current grade.
*Location of public documents:* Otter Tail County, 505 South Court Street, Fergus Falls,
MN 56537
*Responsible governmental unit and contact: *Otter Tail County, Krysten Foster <
[email protected]>,
218-998-8470
Highway 5 Improvements Project: EAW and EA [ [link removed] ]
*Location (city/township; county): *Victoria; Carver
*Process: *EAW
*Step: *EIS need decision
*Joint federal and state review: *Yes
***Responsible governmental unit decision: ***Negative (no EIS ordered)
*Responsible governmental unit record of decision date: *July 29, 2025
*Project description: *Carver County, in cooperation with its partner, the Minnesota Department of Transportation (MnDOT), along with the cities of Chanhassen and Victoria, is proposing to reconstruct Highway 5 to an urban 4-lane roadway between Commercial Avenue in Victoria to Highway 41 in Chanhassen. A roundabout is planned at Commercial Avenue and new traffic signals are proposed at Minnewashta Parkway and Park/Kochia Road. Roadway improvements are also proposed along County Highway 13 (Rolling Acres Rd/Bavaria Rd), which includes reconstruction of the rural 2-lane roadway to an urban 2-lane divided road with a center landscaped median and roundabout intersections at Inter Laken and Tamarack Trail. Several pedestrian/bicycle improvements will be made, which include closing gaps in the existing system and adding enhanced crossings in the form of trail underpasses and a trail bridge. The Project includes drainage features to collect and treat runoff.
Highway 5 Improvements Project: EAW and EA project link provided by RGU [ [link removed] ]
*Location of public documents:* Carver County Public Works, 11360 Highway 212 W,
Cologne, MN 55322
*Responsible governmental unit and contact: *Minnesota Department of Transportation, Diane Langenbach <
[email protected]>, 651-271-7334
Monticello Industrial [ [link removed] ]
*Location (city/township; county): *Monticello Township; Wright
*Process: *Large AUAR
*Step: *Draft order for review
*End of comment period: *September 4, 2025
*Project description: *This AUAR study area encompasses an area totaling approximately 546 acres on 15 parcels in Monticello Township, Wright County, Minnesota. The study is comprised of all land generally located south of 85th St NE, west of Edmonson Ave NE, and east of Davidson Ave NE. Two development scenarios are proposed to be evaluated in the AUAR.
Monticello Industrial project link provided by RGU [ [link removed] ]
*Location of public documents:* Monticello City Hall, 505 Walnut Street, Monticello,
MN 55362
*Responsible governmental unit and contact: *City of Monticello, Angela Schumann <
[email protected]>,
763-271-3224
Hermantown Industrial AUAR [ [link removed] ]
*Location (city/township; county): *Hermantown; St. Louis
*Process: *Large AUAR
*Step: *Draft AUAR
*End of comment period: *September 4, 2025
*Project description: *This AUAR study area encompasses an area totaling approximately 403 acres on 28 parcels in the City of Hermantown, St. Louis County, Minnesota. The study area is bounded to the north by Morris Thomas Road, to the east by Midway Road, and to the west by Solway Road. The southern boundary of the study area extends parallel to Saint Louis River Road, approximately 0.25 miles to the north. One development scenario is proposed to be evaluated in the AUAR. The development scenario includes multiple buildings totaling 1.8 million square feet of proposed light industrial development.
Hermantown Industrial AUAR project link provided by RGU [ [link removed] ]
*Location of public documents:* City of Hermantown, 5105 Maple Grove Road Hermantown, MN 55811
*Responsible governmental unit and contact: *City of Hermantown, Eric Johnson <
[email protected]>,
218-729-3600
I-35E Corridor AUAR Project [ [link removed] ]
*Location (city/township; county): *Lino Lakes; Anoka
*Process: *AUAR update
*Step: *AUAR update adoption
*Responsible governmental unit decision: *Adequate
*Responsible governmental unit record of decision date: *July 14, 2025
*Project description: *The City of Lino Lakes has prepared the required Update to the I-35E Corridor AUAR project. This is the fourth AUAR update and approximately 843 acres of the 4,670 acres project area has now received development approval.
I-35E Corridor AUAR Project project link provided by RGU [ [link removed] ]
*Location of public documents:* City Hall, 600 Town Center Pkwy, Lino Lakes, MN 55014
*Responsible governmental unit and contact: *City of Lino Lakes, Michael Grochala <
[email protected]>,
651-982-2427
Interstate S. Logistics Park AUAR Update [ [link removed] ]
*Location (city/township; county): *Lakeville; Dakota
*Process: *AUAR update
*Step: *AUAR update adoption
*Responsible governmental unit decision: *Adequate
*Responsible governmental unit record of decision date: *July 21, 2025
*Project description: *The study area is 159.2 acres located on 8 parcels east of Jacquard Ave, south of 215 St W, and east of Dodd Blvd in the city of Lakeville. This 2025 AUAR update includes information on development to date, an update to the environmental analysis where necessary, and a review of mitigation measures for the remaining area to be developed.
*Location of public documents:* Lakeville City Hall, 20195 Holyoke Avenue, Lakeville,
MN 55044
*Responsible governmental unit and contact: *City of Lakeville, Tina Goodroad <
[email protected]>,
952-985-4421
Northwest Expansion Area AUAR Update [ [link removed] ]
*Location (city/township; county): *Inver Grove Heights; Dakota
*Process: *AUAR update
*Step: *Revised AUAR
*End of comment period: *August 19, 2025
*Project description: *The AUAR study area is a 3,089-acre area in the northwest portion of the city of Inver Grove Heights. The area is bounded by Interstate 494 on the north, Babcock Trail on the east (approximately), the city’s boundary with Eagan on the west, and includes an area just south of Highway 55 on the south. Development has occurred within the Northwest Area since the original AUAR in 2005.
Northwest Expansion Area AUAR Update project link provided by RGU [ [link removed] ]
*Location of public documents:* Inver Grove Heights City Hall, 8055 Barbara Ave,
Inver Grove Heights, MN 55077
*Responsible governmental unit and contact: *City of Inver Grove Heights, Jason Ziemer <
[email protected]>, 651-450-2546
General notices
Notices published in this section may be required under Minnesota Statute or Rule.
MN Dept. of Agriculture: Notification of Release of Genetically Engineered Organisms
*Notice description: *Pioneer Hi-Bred International, Inc. filed a Notification (MDA no. 25 - NO -34) with the Minnesota Department of Agriculture for the release of a genetically engineered Corn under USDA-APHIS Biotechnology Regulatory Services approval (App. no. AUTH -0000417434). Target counties for release: Blue Earth (50 acres). Project categories: Agronomic Properties, Herbicide Resistance, Insect Resistance, Marker Gene, Other, Product Quality.
*Contact: *Minnesota Department of Agriculture, Michael Merriman <
[email protected]>, 612-508-8270
MN Dept. of Agriculture: Notification of Release of Genetically Engineered Organisms
*Notice description: *Agragene Inc filed a Notification (MDA no. 25 - NO - 35) with the Minnesota Department of Agriculture for the release of a genetically engineered spotted wing drosophila under USDA-APHIS Biotechnology Regulatory Services approval (App. no. AUTH -0000396409). Target counties for release: Dakota (0.7 acres). Project categories: Marker Gene, Other.
*Contact: *Minnesota Department of Agriculture, Michael Merriman <
[email protected]>, 612-508-8270
MN Dept. of Agriculture: Notification of Release of Genetically Engineered Organisms
*Notice description: *University of Minnesota filed a Notification (MDA no. 25 - NO -36) with the Minnesota Department of Agriculture for the release of a genetically engineered Wheat pending USDA-APHIS Biotechnology Regulatory Services approval (App. no. AUTH -0000423413). Target counties for release: Dakota (0.2 acres). Project categories: Fungal Resistance.
*Contact: *Minnesota Department of Agriculture, Michael Merriman <
[email protected]>, 612-508-8270
MN Dept. of Agriculture: Notification of Release of Genetically Engineered Organisms
*Notice description: *KWS Seeds, LLC filed a Notification (MDA no. 25 - NO -37) with the Minnesota Department of Agriculture for the release of a genetically engineered Wheat pending USDA-APHIS Biotechnology Regulatory Services approval (App. no. AUTH -0000441503. Target counties for release: Dakota (10 acres), Goodhue (10 acres). Project categories: Agronomic Properties, Fungal Resistance.
*Contact: *Minnesota Department of Agriculture, Michael Merriman <
[email protected]>, 612-508-8270
Fish kill reports
Minnesota Duty Officer reports pertaining to fish kills are summarized in the following table, in accordance with 103G.216, REPORTING FISH KILLS IN PUBLIC WATERS, Subd. 2 Reporting Requirement. These reports were received via the Minnesota Duty Officer prior to the submission deadline for this edition of the EQB Monitor. They represent the raw data/information provided by callers. For more information regarding fish kills in Minnesota see the Department of Natural Resources [ [link removed] ]. Call the Minnesota Duty Officer at 651‐649‐5451 or 800‐422‐0798 to report fish kills.
*Date*
*Location*
*County*
*Waterbody*
*Species*
*Count*
7/23/2025
Aitkin
Aitkin
Lake Mille Lacs
Panfish
100 +
Submit a notice to the "EQB" "Monitor"
The "EQB Monitor" is a weekly publication announcing environmental review documents, public comment periods and other actions of the Environmental Quality Board. The "EQB Monitor" is published every Tuesday at noon. Submissions to the "EQB Monitor [ [link removed] ]" are due by 4:00 p.m. on the Tuesday one week prior to the intended publication date. Please see the EQB Monitor schedule [ [link removed] ] for more details.
To submit a notice for publication:
Access the EQB monitor submission service [ [link removed] ]
Questions? Contact EQB by phone at 651-757-2873 or email us at
[email protected].
For more information on environmental review, please visit the EQB website or contact us at
[email protected].
Minnesota Environmental Quality Board
*Environmental Quality Board | eqb.state.mn.us [ [link removed] ] *
Email:
[email protected] | Phone: 651-757-2873
Facebook [ [link removed] ] Twitter [ [link removed] ] LinkedIn [ [link removed] ] you tube [ [link removed] ] SUBSCRIBER SERVICES:
Manage Subscriptions [ [link removed] ] | Unsubscribe [ [link removed] ] | Help [ [link removed] ]
Bookmark and Share [ [link removed] ]
body .abe-section-table {max-width:601px !important;} body .abe-column-block {min-height: 5px;} ________________________________________________________________________
This email was sent to
[email protected] using GovDelivery Communications Cloud on behalf of: Minnesota Environmental Quality Board · 520 Lafayette Road North, Saint Paul, MN 55155 GovDelivery logo [ [link removed] ]