Wyoming Department of Environmental Quality | view as a webpage [ [link removed] ]
header new 2
Categorical Exclusion Determination, Town of Meeteetse, WY, Lead Service Line Investigation & Replacement Project
The Department of Environmental Quality/Water Quality Division (DEQ) has conducted a review of the proposed Town of Meeteetse, Wyoming – Lead Service Line Investigation & Replacement Project in accordance with EPA and State of Wyoming procedures for implementing the State Environmental Review Process. DEQ has determined that this project is eligible for a categorical exclusion. Accordingly, DEQ is exempting the project from further substantive environmental review requirements under the State Environmental Review Process. Neither an Environmental Assessment/Finding of No Significant Impact nor an Environmental Impact Statement/Record of Decision will be required for the proposed action. The following is a brief description of the situation and the proposed action and a brief statement of how the action meets the criteria for a categorical exclusion.
The goal of the proposed project is to complete the EPA-mandated service line material inventory and replace any service lines deemed “required to replace” by EPA standards. The project will identify all unknowns on either the “system-side” or the “customer-side”. The full length of any service line requiring replacement by the EPA will be replaced in the proposed project after it has been identified.
The Town is aware of and accepts the fact that they will be responsible for any required mitigative actions associated with and including storm water runoff, erosion control, archeological/historic artifacts, and air quality concerns. These will be part of the standard State Revolving Funds Program contract conditions.
DEQ is granting an exclusion because the project consists of minor ground disturbances of existing infrastructure. This project will be completed in previously disturbed ground, specifically ground disturbed by previously installed water service lines. No work shall occur in the waters of the U.S.
DEQ has determined that exempting the proposed project from further review under the State Environmental Review Process will not result in adverse impacts to the population or the area of the Town of Meeteetse, in Park County, Wyoming.
The documentation to support this decision will be on file in the DEQ Cheyenne Office and is available for public review upon request. Requests for information about the proposed decision may be directed to Tim Eisenhauer, SRF Project Engineer by email at*
[email protected]* or phone (307) 777-6371. Written comments shall be addressed to Tim Eisenhauer, Department of Environmental Quality, 200 W. 17th St., Suite 200, Cheyenne, WY 82002 or via FAX (307) 635-1785., and be postmarked on or before 5:00 p.m. on September 4, 2025 to be considered. Electronic comments may only be submitted through and accepted by the Wyoming DEQ comment portal provided at *[link removed]*. Phone or email comments will not be accepted.
*Para español, visite deq.wyoming.gov*. "Americans with Disabilities Act: special assistance or alternative formats will be made available upon request for individuals with disabilities. Please provide at least fourteen (14) days before the close of the public comment period for such requests."
________________________________________________________________________
View in Español [ [link removed] ]
DEQ [ [link removed] ]
Hot New Topic:
State of the Environment - DEQ's Podcast [ [link removed] ]
View in Spanish [ [link removed] ]
stay connected:
Facebook [ [link removed] ] Twitter [ [link removed] ] LinkedIn [ [link removed] ] Instagram [ [link removed] ] Youtube [ [link removed] ]
unsubscribe [ [link removed] ] | manage preferences [ [link removed] ] | help [ [link removed] ]
________________________________________________________________________
This email was sent to
[email protected] using GovDelivery Communications Cloud on behalf of: Wyoming Department of Environmental Quality · 200 West 17th St.· Cheyenne, WY 82002 GovDelivery logo [ [link removed] ]
body .abe-column-block { min-height: 5px; } table.gd_combo_table img {margin-left:10px; margin-right:10px;} table.gd_combo_table div.govd_image_display img, table.gd_combo_table td.gd_combo_image_cell img {margin-left:0px; margin-right:0px;} table.govd_hr {min-width: 100%;} p, li, h1, h2, h3 { overflow-wrap: normal; word-wrap: normal; word-break: keep-all; -moz-hyphens: none; -ms-hyphens: none; -webkit-hyphens: none; hyphens: none; mso-hyphenate: none; }