From County of San Diego <[email protected]>
Subject Upcoming Work on Border Sewage System May Temporarily Increase Tijuana River Valley Flows
Date May 10, 2025 1:11 AM
  Links have been removed from this email. Learn more in the FAQ.
  Links have been removed from this email. Learn more in the FAQ.
County News Center logo [ [link removed] ]

Upcoming Work on Border Sewage System May Temporarily Increase Tijuana River Valley Flows [ [link removed] ] 05/09/2025 06:06 PM PDT
Reading Time: 2 minutes The second and final phase in the connection of a sewer line in Mexico (the new International Collector) will begin soon and may temporarily increase wastewater flows to the U.S.

More [ [link removed] ]

Map of Tijuana River Valley [ [link removed] ] body { font-size: 1em; font-family: Arial, Verdana, sans-serif; font-weight: normal; font-style: normal; color: #333333; }

________________________________________________________________________

Update your subscriptions, modify your password or e-mail address, or stop subscriptions at any time on your Subscriber Preferences Page [ [link removed] ]. You will need to use your email address to log in. If you have questions or problems with the subscription service, please visit subscriberhelp.govdelivery.com [ [link removed] ].

This service is provided to you at no charge by County of San Diego [ [link removed] ].

________________________________________________________________________

This email was sent to [email protected] using GovDelivery Communications Cloud on behalf of: County of San Diego, California · 1600 Pacific Highway · San Diego, CA · 858-694-3900 GovDelivery logo [ [link removed] ]
body .abe-column-block { min-height: 5px; } table.gd_combo_table img {margin-left:10px; margin-right:10px;} table.gd_combo_table div.govd_image_display img, table.gd_combo_table td.gd_combo_image_cell img {margin-left:0px; margin-right:0px;} table.govd_hr {min-width: 100%;}
Screenshot of the email generated on import

Message Analysis