Wyoming Department of Environmental Quality | view as a webpage [ [link removed] ]
header new 2
Notice of Public Meeting, Green River/Rock Springs/Sweetwater Co.-Joint Powers Water Board, Crossroads Pump Station Project
The Green River/Rock Springs/Sweetwater Co.-Joint Powers Water Board (JPWB) will conduct a public meeting at 2 p.m. local time, on May 21, 2025, in the Rock Springs City Council Chambers, at 212 D Street, Rock Springs Wyoming. The purpose of the meeting is to allow citizens to review and comment on the Crossroads Pump Station Project. The project’s primary purpose is to increase pumping capacity to all areas north of I-80 in Rock Springs. The service area's system is near capacity and this project will improve service to the area. The project will also provide redundancy to the existing pumping/transmission system.
At the meeting, the JPWB will present the preliminary design of the proposed project and will discuss the estimated cost of the improvements and the plan for funding the improvements. A preliminary plan of improvements, cost estimates, and the funding plan can also be reviewed at Sunrise Engineering. Contact Dave Kennington at 307-886-4205.
Based on current cost estimates, the JPWB plans to borrow $ 9,000,000 from the Wyoming Drinking Water State Revolving Loan Fund administered by the Wyoming Office of State Lands and Investments. The loan’s debt service is to be paid by the City of Rock Springs Water Enterprise Fund. The City of Rock Springs has increased user fees to repay the loan. The average rate increase per user is estimated to be $3.84 per month to repay the loan. Loan terms will be 0.5% interest rate and 20 years.
Written comments are also welcome. Send written comments to Sunrise Engineering 770 S. Washington, Suite A, Afton, WY 83110, by 2 p.m. on May 21, 2025.
*Para español, visite deq.wyoming.gov [ [link removed] ]*. "Americans with Disabilities Act: special assistance or alternative formats will be made available upon request for individuals with disabilities. Please provide at least fourteen (14) days before the close of the public comment period for such requests."
________________________________________________________________________
View in Español [ [link removed] ]
DEQ [ [link removed] ]
Hot New Topic:
State of the Environment - DEQ's Podcast [ [link removed] ]
View in Spanish [ [link removed] ]
stay connected:
Facebook [ [link removed] ] Twitter [ [link removed] ] LinkedIn [ [link removed] ] Instagram [ [link removed] ] Youtube [ [link removed] ]
unsubscribe [ [link removed] ] | manage preferences [ [link removed] ] | help [ [link removed] ]
________________________________________________________________________
This email was sent to
[email protected] using GovDelivery Communications Cloud on behalf of: Wyoming Department of Environmental Quality · 200 West 17th St.· Cheyenne, WY 82002 GovDelivery logo [ [link removed] ]
body .abe-column-block { min-height: 5px; } table.gd_combo_table img {margin-left:10px; margin-right:10px;} table.gd_combo_table div.govd_image_display img, table.gd_combo_table td.gd_combo_image_cell img {margin-left:0px; margin-right:0px;} table.govd_hr {min-width: 100%;} p, li, h1, h2, h3 { overflow-wrap: normal; word-wrap: normal; word-break: keep-all; -moz-hyphens: none; -ms-hyphens: none; -webkit-hyphens: none; hyphens: none; mso-hyphenate: none; }