From Wyoming Department of Environmental Quality <[email protected]>
Subject Updated Public Notice: Public Meeting, Elk Refuge Sewer District, Elk Refuge Sewer District Wastewater Conveyance System
Date April 9, 2025 2:01 PM
  Links have been removed from this email. Learn more in the FAQ.
  Links have been removed from this email. Learn more in the FAQ.
Wyoming Department of Environmental Quality  | view as a webpage [ [link removed] ]

header new 2
Updated Notice of Public Meeting: Elk Refuge Sewer District, Elk Refuge Sewer District Conveyance System

The Elk Refuge Sewer District of Teton County, Wyoming, will hold a public meeting at 3 p.m. local time on *Monday, April 28th 2025*, at 1755 North Highway 89, Jackson, Wyoming 83001. The meeting will allow citizens to review and comment on the following project(s).

*Summary Explanation of the Elk Refuge Sewer District Wastewater Conveyance System:*

The Elk Refuge Sewer District is developing an advanced wastewater conveyance system to connect to the Town of Jackson. Currently, District members utilize separate conventional septic systems and leach fields to treat wastewater. This project will facilitate the delivery of wastewater from the District members to the Town of Jackson’s collection system and ultimately to the Town’s Wastewater Treatment plant. This project will eliminate the District’s discharge of effluent to the soils and water table adjacent to the Elk Refuge. A gravity collection system will gather wastewater through 6-in main lines to a grinder manhole and then to a lift station. Wastewater will then be pumped through a 4-inch HDPE force main approximately 8,000 feet to connect to the Town’s sewer collection system.

At the meeting, the Elk Refuge Sewer District will present the preliminary design of the proposed project and discuss the estimated cost and funding plan. The preliminary plan of improvements, cost estimates, and funding plan can also be reviewed at 1755 North Highway 89, Jackson, WY 83001. For more information, contact Monay Olson at (307) 699-4707 or email* [email protected]. <[email protected]>*

Based on current cost estimates, the Elk Refuge Sewer District plans to borrow $3,626,264 from the Wyoming Clean Water State Revolving Loan Fund administered by the Wyoming Office of State Lands and Investments. The average rate increase is estimated to be $3,216.00/month per user to repay the loan. The average rate increase will be estimated by the district and paid by each user to repay the loan. Loan terms will be 1% interest rate and 30 years.

Written comments are also welcome. Please send them to the address below by 5 p.m. on April 13th 2025, one day before the meeting.

Elk Refuge Sewer District

Attention: Monay Olson

PO Box 13942

Jackson, Wyoming 83002

*Para español, visite deq.wyoming.gov [ [link removed] ].* "Americans with Disabilities Act: special assistance or alternative formats will be made available upon request for individuals with disabilities. Please provide at least fourteen (14) days before the close of the public comment period for such requests."


________________________________________________________________________



View in Español [ [link removed] ]

DEQ [ [link removed] ]
                        Hot New Topic:

     State of the Environment - DEQ's Podcast [ [link removed] ]




View in Spanish [ [link removed] ]

stay connected:

Facebook [ [link removed] ]  Twitter [ [link removed] ]  LinkedIn [ [link removed] ]  Instagram [ [link removed] ]  Youtube [ [link removed] ]

unsubscribe [ [link removed] ]  |  manage preferences [ [link removed] ]  |  help [ [link removed] ]

________________________________________________________________________

This email was sent to [email protected] using GovDelivery Communications Cloud on behalf of: Wyoming Department of Environmental Quality · 200 West 17th St.· Cheyenne, WY 82002 GovDelivery logo [ [link removed] ]
body .abe-column-block { min-height: 5px; } table.gd_combo_table img {margin-left:10px; margin-right:10px;} table.gd_combo_table div.govd_image_display img, table.gd_combo_table td.gd_combo_image_cell img {margin-left:0px; margin-right:0px;} table.govd_hr {min-width: 100%;} p, li, h1, h2, h3 { overflow-wrap: normal; word-wrap: normal; word-break: keep-all; -moz-hyphens: none; -ms-hyphens: none; -webkit-hyphens: none; hyphens: none; mso-hyphenate: none; }
Screenshot of the email generated on import

Message Analysis