From [email protected] <[email protected]>
Subject Water Line Break - UPDATE
Date April 2, 2024 7:23 PM
  Links have been removed from this email. Learn more in the FAQ.
  Links have been removed from this email. Learn more in the FAQ.
 

jb

 

*UPDATE 4-2-24*

Repair Efforts continue with the 48-inch main on the Fort Cavazos Military Reservation. A damaged section was replaced overnight and briefly placed back in service about 8:30 this morning when a leak was discovered on the upstream pipe segment. Upon closer examination, the upstream pipe joint has a longitudinal crack that appears to extend the entire length of that pipe joint. The contractor is now excavating that entire pipe joint so that it can be closer examined to assess what repairs will be needed. Excavation is expected to last until 5 or 6 pm due to the presence of large solid rock on either side of the pipe. Once excavation is complete a realistic timeline for completion can be provided.

 

City of Harker Heights remains on a Stage 4 Drought Contingency Plan.  


* Press Release 4-2-2024.pdf [ [link removed] ]
________________________________________________________________________

Update your subscriptions, modify your password or email address, or stop subscriptions at any time on your Subscriber Preferences Page [ [link removed] ]. You will need to use your email address to log in. If you have questions or problems with the subscription service, please visit subscriberhelp.govdelivery.com [ [link removed] ].

This service is provided to you at no charge by Harker Heights, TX [ [link removed] ].

________________________________________________________________________

This email was sent to [email protected] using govDelivery Communications Cloud on behalf of: Harker Heights, TX · 305 Millers Crossing · Harker Heights, TX 76548 GovDelivery logo [ [link removed] ]
Screenshot of the email generated on import

Message Analysis