From Wyoming Department of Environmental Quality <[email protected]>
Subject Public Meeting in Pinedale, Wyoming on April 8, 2024
Date March 28, 2024 5:07 PM
  Links have been removed from this email. Learn more in the FAQ.
  Links have been removed from this email. Learn more in the FAQ.
Wyoming Department of Environmental Quality  | view as a webpage [ [link removed] ]

Wyoming Department of Environmental Quality
Public Notice: The Town of Pinedale, Wyoming, will conduct a public meeting at 5:00 PM, local time, on April 8, 2024

*NOTICE OF PUBLIC MEETING*

The Town of Pinedale, Wyoming, will conduct a public meeting at 5:00 PM, local time, on April 8, 2024, in the Town Council Chambers located at Pinedale Town Hall, 205 Entertainment Lane, Pinedale, WY 82941. The purpose of the meeting is to allow citizens to review and comment on the following: 1) the Pinedale Shallow Water Main Sewer Replacement Project, and 2) the Wastewater Treatment Facility Rehabilitation Phase 1 and Phase 2 Engineering Project.

The Pinedale Shallow Water Main Sewer Replacement Project consists of removal of existing sewer mains and services beneath Shanley Avenue and Jade Street and replacement with approximately 1100 linear feet of eight and ten-inch diameter pipe. Work includes the completion of necessary surface repairs due to the location of the underground infrastructure and is anticipated to be constructed in fall 2024 in conjunction with the Shallow Water Main Replacement Project.

The Wastewater Treatment Facility Rehabilitation Phase 1 and Phase 2 Engineering Project will remove and replace deteriorated anaerobic pond covers and the UV disinfection system which has reached the end of its useable life, upgrade the bulk septic receiving to further protect the treatment equipment and treatment train, and install an outlet diffuser to improve mixing discharge waters across Pine Creek. The Phase 2 Engineering portion of the project will include the engineering design of a secondary treatment upgrade to the Wastewater Treatment Facility pursuant to the findings of the Wastewater Treatment Master Plan to reduce discharge of ammonia and other discharge parameters regulated by the Town of Pinedale WYPDES permit with WYDEQ. It is anticipated that the work will be completed in 2025.

At the meeting, the Town of Pinedale will present the preliminary designs of the proposed projects and will discuss the estimated costs of the improvements and the plans for funding the improvements. Preliminary plans of improvements, cost estimates, and the funding plans can also be obtained for review by contacting the office of Nelson Engineering, 430 S Cache St, Jackson, WY. Contact Matt Bowers at (307) 733-2087, or [email protected].

Based on current cost estimates, the Town of Pinedale plans to borrow $294,834 from the Wyoming Clean Water State Revolving Loan Fund for the Pinedale Shallow Water Main Sewer Replacement Project and $1,895,350 for the Wastewater Treatment Facility Rehabilitation Phase 1 and Phase 2 Engineering Project administered by the Wyoming Office of State Lands and Investments. Increased user fees and reserves from the sewer enterprise fund will repay the loan. The average rate increase is estimated to be $0.80/month per user to repay the sewer loan and $4.39/month per user to repay the WWTF loan. Loan terms will be, at maximum, 1.5% interest rate and 30 years.

Written comments are also welcome. Send written comments to Nelson Engineering, Attn: Suzanne Lagerman, P.O. Box 1599, Jackson, WY 83001, or [email protected] by 2:00 P.M. local time on April 8, 2024.

*Para español, visite* *deq.wyoming.gov [ [link removed] ]*." Americans with Disabilities Act: special assistance or alternative formats will be made available upon request for individuals with disabilities. Please provide at least fourteen (14) days before the close of the public comment period for such requests"


________________________________________________________________________



View in Español [ [link removed] ]

Learn more about the Water Quality Division

50th Logo [ [link removed] ]

*Watch Our Video: 
**Water Quality Division Overview [ [link removed] ]*





View in Spanish [ [link removed] ]

stay connected:

Facebook [ [link removed] ]  Twitter [ [link removed] ]  LinkedIn [ [link removed] ]  Instagram [ [link removed] ]  Youtube [ [link removed] ]

unsubscribe [ [link removed] ]  |  manage preferences [ [link removed] ]  |  help [ [link removed] ]

________________________________________________________________________

This email was sent to [email protected] using GovDelivery Communications Cloud on behalf of: Wyoming Department of Environmental Quality · 200 West 17th St.· Cheyenne, WY 82002 GovDelivery logo [ [link removed] ]
Screenshot of the email generated on import

Message Analysis