Good afternoon, 

Please be advised of a pending navigation project in Narraguagus Bay [ [link removed] ]. Comment period is open. 

________________________________________________________________________

March 6, 2024

 

Pursuant to 38 M.R.S. §480-D, sub-§9, the Maine Department of Marine Resources (DMR) is required to provide the Maine Department of Environmental Protection with an assessment of the impacts on the fishing industry of a proposed dredging operation. The U.S. Army Corps of Engineers, New England District is proposing maintenance dredging of the channel and anchorages of the Narraguagus River Federal Navigation Project (FNP).

The project provides a 150-foot-wide channel authorized to a depth of 11-feet Mean Lower Low Water (MLLW) from deep water in Narraguagus Bay to Wyman, then 9-feet deep by 100-feet wide to the lower town landing at Milbridge, and then 6-feet deep by 100-feet wide to the larger upper town landing downstream from the Route 1A Bridge with a small turning basin at the head of the channel. Details on the dredge operation and proposed haul route can be found on the DMR website at www.maine.gov/dmr.

In lieu of hearing, DMR will accept written comments about the potential impacts of the proposed dredging operation on fishing in the area to be dredged and impacts to the fishing industry of the proposed route to transport the dredge spoils to the Douglas Island Disposal Site. Comments should be sent to DMR at the email or mailing address listed below by 5:00 p.m. April 5, 2024. The Department will hold a hearing if requested by 5 or more persons by 5:00 pm April 5, 2024.

Department of Marine Resources, Attn: Environmental Permit Review, 21 State House Station, Augusta, Maine 04333 or email: [email protected]

________________________________________________________________________

Please note: This inbox is not monitored for replies. 


* Narraguagus River FNP Haul Route 1000ft.pdf [ [link removed] ]
* Narraguagus River FNP Haul Route.pdf [ [link removed] ]

________________________________________________________________________

Fair winds to you and yours.

 

*Melissa D. Smith*

Marine Resource Management Coordinator - Scallop & Pelagic Fisheries

Maine Department of Marine Resources

21 State House Station, 32 Blossom Lane

Augusta, ME 04333-0021

*Updated contact info: *Call or text (207) 441-5040

________________________________________________________________________

DO NOT REPLY TO THIS EMAIL AS RESPONSES ARE NOT MONITORED. 

This service is provided to you at no charge by Maine Department of Marine Resources [ [link removed] ]. 

________________________________________________________________________

This email was sent to [email protected] using GovDelivery Communications Cloud on behalf of: Maine Department of Marine Resources · 21 State House Station · Augusta, ME 04333-0021· 207-624-6550 GovDelivery logo [ [link removed] ]
Screenshot of the email generated on import

Message Analysis