Texas Department of Transportation


Location: Brownsville
Date: 02/12/24
Purpose: TxDOT is proposing to redesign FM 3248 (E. Alton Gloor Blvd.) from I-69E to FM 1847 from an existing five-lane roadway with a continuous left turn lane to a six-lane roadway with a raised median and a 10-foot-wide shared use path in each direction in Cameron County, Texas.

Location: Abilene
Date: 02/08/24
Purpose: TxDOT will be conducting an in-person public meeting with a virtual option on the proposed project which includes widening I-20 to three lanes in each direction and improvements to ramps and frontage roads would be implemented, along with providing bicycle and pedestrian accommodations. The project area includes I-20 from Abilene West city limits to 0.6 miles west of Catclaw Creek, a project length of 5.21 miles.

Visit TxDOT.gov for a complete list of upcoming hearings and meetings.


This email was sent to [email protected] using GovDelivery Communications Cloud on behalf of: Texas Department of Transportation ? 125 E. 11th Street ? Austin, TX 78701 ? 1-800-558-9368 GovDelivery logo