From Nottingham City Council <[email protected]>
Subject 🚧 ⚠️ Latest disruption updates including planned roadworks & Queens Drive remains closed
Date January 12, 2024 9:33 AM
  Links have been removed from this email. Learn more in the FAQ.
  Links have been removed from this email. Learn more in the FAQ.
??‍♀️ ??Traffic & travel latest news - Let's keep Nottingham moving ?? ??



Bookmark and Share [ [link removed] ]  -  Having trouble viewing this email? View it as a Web page [ [link removed] ].




Traffic header




Roadworks
________________________________________________________________________



* Friday 5 January - Friday 26 April: Lane closure on *Western Boulevard* for gas mains replacement
* Sunday 28 January 9.30am - 3.30pm: Lane closure on *Queen's Road, city centre,* for safe access to underground structure
* Monday 8 - Friday 12 January 8am - 5pm: *Road closure of side street, Burford Road & Russell Road, Gregory Boulevard *for footpath repair works
* Tuesday 9 - Friday 12 January 9.30am - 3.30pm:** Lane closure on Clifton Lane from main road to entrance to Pump House** for duct works
* Wednesday 10 - Thursday 11 January 8pm - 6am: Lane closure on *Mansfield Road* for works to repair manhole cover on the footpath
* Thursday 11 - Friday 12 January 8am - 5pm: 4-way traffic lights at *Lace Street junction with Montpelier Road and Claude Street in the city centre* for fibre cable works
* Thursday 11 January - Friday 16 February: *Four-way temporary signals on the junction of *Bulwell High Road/ Main Street & Ravensworth Road junction, Bulwell **for traffic signal works
* Friday 12 January 9.30am - 12.30pm: Lane closure on *University Boulevard outside Tennis Centre* for works to repair traffic signal detection loops
* Saturday 13 - Sunday 14 January: Lane closure on *Radford Boulevard* for Severn Trent Water works
* Saturday 13 - Sunday 14 January 8am - 4pm: Lane closure on *Huntingdon Street *for Severn Trent Water works
* Sunday 14 January 7am - 11am: Short lane closures on *Carlton Road / Manvers Street / Bath Street / Southwell Road* as required for traffic signal ducting survey
* Sunday 14 January 8am - 4pm: Lane closure on *Wollaton Road, Wollaton* for Severn Trent Water works
* Sunday 14 January 8am - 4pm: 4-way lights on *Radford Road *for Severn Trent Water works
* Sunday 14 January 8am - 4.30pm: 4-way lights on *Rennie Hogg Road at rear of Keltruck Scania*, for communications upgrade
* Sunday 14 January 8am - 6pm: 3-way lights and temporary crossing on *Wollaton Vale* for telecoms upgrades and maintenance
* Sunday 14 January 9.30am - 3.30pm: 2-way lights on* Nottingham Road, New Basford* for works to an overhead structure
* Sunday 14 January 9.30am - 5pm: Lane closure on Aspley Lane, Aspley for Severn Trent Water works
* Monday 15 - Tuesday 16 January: Off-peak lane closure on *Clifton Lane from Ruddington Lane* for works to lay duct in footpath
* Monday 15 - Wednesday 17 January 9am - 4pm: *Road closure between 28 & 42 Balmoral Road, Hyson Green & Arboretum* for Severn Trent Water works
* Monday 15 - Friday 19 January 8am - 5pm: Road closure and parking suspension on *Ryton Square, Aspley* for road resurfacing
* Monday 15 - Friday 19 January: *Road closure of side street, Leslie Road, Premier Road & Foxhall Road, Gregory Boulevard* for footpath repair works
* Monday 15 - Monday 22 January: 3-way lights on *Listowel Crescent, Clifton,* for Western Power works
* Monday 15 January - Friday 2 February: *Road closure between 69 & 67 outside the Community Centre, Gainsford Crescent, Bestwood *for construction works
* Wednesday 17 - Thursday 18 January 1am - 5.30am: Single file traffic, northbound lane closed through tram stop. Use southbound traffic lane for diversion, sending vehicles on the other side of the tram stop platform at* Clifton Centre tram stop *for tram maintenance works
* Saturday 20 - Sunday 21 January 8am - 4pm: 3-way lights on* Sneinton Dale, Sneinton* for Severn Trent Water works 
* Sunday 21 January: Lane closure outside *144-146 Mansfield Road* for Severn Trent Water works
* Sunday 21 January 8am - 4pm: 4-way lights on *Strelley Road* for Severn Trent Water works
* Sunday 21 January: 3-way lights on *Aspley Lane* for Severn Trent Water works
* Sunday 21 January - Friday 15 March: Parking suspension between *Houseman Gardens and Manifold Gardens, Robin Hood Way, Meadows* for subway works
* Monday 22 January 11.30pm - Tuesday 23 January 6am: Road closure 20metres either side of level crossing on *Colwick Road, Dales* for level crossing works
* Monday 22 January - Saturday 2 March: 4-way lights and off-peak lane closures as required at *Junction of Bulwell High Road / Ravensworth Road / Main Street, Bulwell for traffic light refurbishment*
* Monday 22 January - Saturday 2 March: 4-way lights with off-peak lane closures as required at *Junction of A611 Hucknall Road / Haydn Road* for traffic light refurbishment
* Monday 22 January - Friday 29 March 8am - 5pm daily: Road closure and parking suspension on *Burford Road, Hyson Green and Arboretum, for whole road from Gregory Boulevard to Gladstone Street* for road resurfacing
* Monday 22 January - Friday 29 March 8am - 5pm daily: Road closure and parking suspension on *Church Street, Basford between Nottingham Road to Basford Road *for road resurfacing
* Monday 22 January - Friday 29 March 8am - 5pm daily: Road closure and parking suspension on *Ilkeston Road, Radford between St Helens Street to Seely Road *for road resurfacing
* Monday 22 January - Friday 29 March 8am - 5pm daily: Road closure and parking suspension on *Lincoln Street, Basford between Nottingham Road and David Lane *for road resurfacing
* Monday 22 January - Friday 29 March 8am - 5pm daily: Road closure and parking suspension on *Wilford Crescent East, Meadows between Felton Road and Bathley Street *for road resurfacing
* Monday 22 January - Friday 29 March 8am - 5pm daily: Road closure and parking suspension on *Willow Road, Lenton between Games Workshop car park and end of the street *for road resurfacing
* Sunday 28 January 9am - 4pm:Road closure from* the junction of Ebers Road to outside 24 Zulla Road Mapperley *for Severn Trent Water works
* Sunday 28 January 9am - 4pm:* Road closure of the service road opposite Coral Bookmakers, Arnold Road, Bestwood *for carriageway works
* Sunday 28 January 9am - 4pm: Road closure between* North Gate and Ford Street on Monsall Street, Berridge *for Severn Trent Water works
* Sunday 28 January 9.30am - 3.30pm: Lane closure on *Queen's Road, city centre,* for safe access to underground structure
* Tuesday 30 January - Friday 2 February: Off-peak lane closure on *Woodside Road at junction with Audley Drive - junction with Derby Road* for works to lay duct in footpath
* Until Sunday 28 April 2024: Lane closure 24 hours on *Glasshouse Street and 9.30am - 3.30pm on Lower Parliament Street* for development works
* Until 29 August 2024: Road closure on *Howard Street, St Ann's* for construction works
* Until 31 March 2025: Parking bay suspension and partial road closure on *Kent Street, St Ann's* for construction works
* Until Thursday 31 July 2025: *Road closure of Thackeray Street and Parking bay suspension on Denman Street East, Highurst Street & Boden Street *for new development
* *Ongoing Streets for People works are taking place around the city - see what's happening near you here [ [link removed] ]*

________________________________________________________________________


Public Transport
________________________________________________________________________



 

*Service disruption information*

* Nottingham City Transport service updates [ [link removed] ]
* Check before you travel using Net Tram's social media channels [ [link removed] ] 
* Check before you travel using Trentbarton's Facebook [ [link removed] ]and Twitter  [ [link removed] ]
* Check for CT4N service updates via their Twitter [ [link removed] ]and website [ [link removed] ]

________________________________________________________________________



Queens Drive Park & Ride closed until further notice due to flooding

Following Storm Henk and extreme rainfall, Queens Drive Park & Ride was flooded. Our teams are assessing the safety of the site, and we hope it will reopen next week. We'll keep you updated via the Transport Nottingham social media channels (Facebook, Twitter) and this email. 


* Medilink is continuing to operate via City Hospital and Queens Medical Centre [ [link removed] ]
* NCT 49 is continuing to serve other stops, missing out Queens Drive Park & Ride [ [link removed] ]. Alternative NCT Park & Ride to the City Centre is available at the Racecourse P&R Site (NG2 4BE). 

________________________________________________________________________


train
 

*Travelling by train?*

* Latest Travel updates and planned engineering works from East Midlands trains [ [link removed] ]

________________________________________________________________________











Transport Strategy, Nottingham City Council, Loxley House, Station Street, Nottingham, NG2 3NG

[link removed] [ [link removed] ]

[ [link removed] ]Facebook [ [link removed] ] | Twitter [ [link removed] ]

Review your emails topics or unsubscribe [ [link removed] ]


________________________________________________________________________

  [ [link removed] ]  

This email was sent to [email protected] using GovDelivery Communications Cloud on behalf of: Nottingham City Council ¡ Loxley House, Station Street ¡ Nottingham. NG2 3NG

logo

 

body .abe-column-block {min-height: 5px;}
Screenshot of the email generated on import

Message Analysis