October 2023 ? MDOT Construction Manual Updates

The tables below list all Major and Minor changes to the MDOT Construction Manual in the past several months.??

All changes for the past 12 months can be found in the table of Recent Major Changes and the table of Recent Minor Changes?or can also be found in the Construction Manual on the Main Page.?

Recent Major Changes to the Construction Manual

The table below is a list of Major changes in the last 12 months.

Updated Division Section Summary What Changed
9/26/2023
Division 8
823 - Water Mains
Added new content to previously empty Section 823 with pictures, video, and re-format to new Construction Manual style. Compare Here
9/25/2023
Division 10
Division 10 - Mix Designs
Created entire New Division of Construction Manual for Division 10 - Mix Designs with links to Standard Specifications for 1001 - Concrete Production Equipment and Facilities, 1002 - Contractor Quality Control for Concrete, 1003 - Quality Assurance (Acceptance) for Concrete, 1004 - Portland Cement Concrete Mixtures, 1005 - Mortar and Grout Mixtures, and 1006 - Patching, Repair, & Overlay Mixtures. Compare Here
9/25/2023
Division 9
Division 9 - Materials
Created entire New Division of Construction Manual for Division 9 Materials with links to Standard Specifications for each of the 23 Sections. Compare Here
09/20/2023
Division 1 Supplemental
E-Signature
Added clarification for Stamp approval of 0582B Moisture & Density Determination form. Also created?Frequently Asked Signature Questions?Section on page with signature clarification on 1302, 0501, 1100A, 1165 and 0582B forms View Here
9/11/2023
Division 1
105.10 - Buy America Source of Steel and Iron
Removal of CFS maintained Buy America certification process. Compare Here
9/7/2023
Division 5
501 - Plant Produced Hot Mix Asphalt
Updated contents of entire section 501 with pictures, video, and re-format to new Construction Manual style. Compare Here
9/5/2023
Division 8
810 - Permanent Traffic Signs and Supports
Updated contents of entire section 810 with pictures, video, and re-format to new Construction Manual style. Compare Here
8/30/2023
Division 8
820 - Traffic Signals
Clarification on payment for signal work. Compare Here
8/9/2023
Division 1
109.07 - Construction Progress Pay Estimate Approval Process
Updated contents of entire section 109.07 to reflect removal of digital signature requirements on Pay Estimates and add examples of PDF approval stamps Compare Here
7/18/2023
Division 1
105 - Structural Fabrication Quality Manual
Updated content on Structural Fabrication Quality Manual for 2023 version 3 release. Compare Here
07/13/2023
Division 1
102.19 - Evaluation of Contractor Performance and Contract Non-Compliance
New Section added for Evaluation of Contractor Performance and Contract Non-Compliance Compare Here
07/13/2023
Division 1
102.01 - Prequalification of Bidders
Removal of Contractor Performance Evaluation (CPE) process and replacement with?1165 Notice of Non-Compliance Process?for trunkline projects. Compare Here
06/06/2023
Division 1
103.02 - Contract Revisions
Updated guidance for electronic stamp approvals, AASHTOware software, Supporting Documentation for Extra work, & updated flow chart. Also the threshold for Original Pay Item increase or decrease changed from $25k to $50k Compare Here
05/24/2023
Division 1 Supplemental
Prevailing Wage
Updated Jobsite Posters View Here
05/18/2023
Division 1
107.06 - Furnishing Right-of-Way
New Content added for Contractor Requests to break Limited Access Right-of-Way (LAROW) on Interstates Compare Here
05/17/2023
Division 2
204 - Removing Miscellaneous Structures and Materials
Updated language for Vertical Exploratory Investigation for Relocation section Compare Here
04/18/2023
Division 2
208 - Soil Erosion and Sedimentation Control (NPDES)
Added link to MDOT SESC Pocket Guide Compare Here
04/18/2023
Division 1 Supplemental
FieldManager
Updated IDR requirements to replace digital signature with PDF stamp Compare Here
04/14/2023
Division 1 Supplemental
Certified Engineer Process
Updated Certified Engineer Process Compare Here
03/20/2023
Division 1 Supplemental
E-Signature
Updated MDOT Digital Signatures Guidance for One-Span View Here
03/20/2023
Division 1 Supplemental
Preconstruction Meeting
Updated Trunk Line and Local Agency Program Boilerplate Preconstruction Meeting Minutes - 2023 View Here
03/08/2023
Division 1
108.09 - Request for Time Extensions on Work Day, Calendar Day, and Calendar Date Contracts
Updated content for Extension of Time for Work Day, Calendar Day and Calendar Date Contracts and moved content from 108.07 to 108.09. Compare Here
10/17/2022
Division 1 Supplemental
Construction Field Services Indirect Testing Charges
Updated content with FY2023 Program Numbers View Here
10/11/2022
Division 1
104 - Construction Value Engineering Change Proposal (VECP)
Updated content for Construction Value Engineering Change Proposal (VECP). Compare Here
10/11/2022
Division 8
820 - Traffic Signals
Added new Acceptance of Traffic Signal Work content, including pay item list and form. View Here
9/19/2022
Division 1 Supplemental
FHWA Risk-Based Project Involvement
Updated content to remove references to FHWA Projects of Division Interest (PoDI) and replaced with FHWA Risk-Based Project Involvement (RBPI). References now link to the FHWA Risk-Based Project Involvement (RBPI) Stewardship & Oversight Plan (S&O Plan) page which contains instructions on how to locate each project's S&O Plan in ProjectWise to determine FHWA involvement. View Here

?

Recent Minor Changes to the Construction Manual

The table below is a list of Minor changes in the last 12 months.

Updated Division Section Summary What Changed
09/21/2023
Division 1 Supplemental
MDOT Density Testing and Inspection Manual
Updated links to the?MDOT Density Testing and Inspection Manual Compare Here
09/14/2023
Main Page
Recent Major Change Table
Updated Recent Major Change Table to make all Division and Section Category Items Hyperlinks Compare Here
09/13/2023
Main Page
Recent Minor Change Table
Updated Recent Minor Change Table to make all Division and Section Category Items Hyperlinks Compare Here
09/13/2023
Division 5
501 - Mix Designs & Job Mix Formulas
Updated example form 1931 SUPERPAVE HMA Design Mix Formula and form 1911 Job Mix Formula (JMF) forms. Compare Here
08/30/2023
Division 8
819 - Electrical and Lighting
Removed outdated language on 2015 Bid Letting. Compare Here
08/30/2023
Division 8
811 Uniform Price Adjustment
Added Wet Reflective Paint to Uniform Price Adjustments Compare Here
08/30/2023
Division 8
820 Acceptance of Traffic Signal Work
Clarified Acceptance Criteria for Traffic Signal Work Compare Here
08/22/2023
Division 1 Supplemental
Construction Technology Support Resources
Updated Construction Technology Support Contacts & Help Desk info. Compare Here
08/22/2023
Division 1
102.19 Evaluation of Contractor Performance and Contract Non-Compliance
Additional info on transition from CPEs to Notice of Non-Compliance added with link to 20SP-102D-01 Compare Here
08/21/2023
Division 5
501 Plant Produced Hot Mix Asphalt - Base Preparation
Updated Base preparation, Bond Coat Structure Adjustments, Yield Calcs and Milling Sections to include photos & examples Compare Here
07/13/2023
Division 1
Project Closeout Escalation of Accountability,?Local Agency Program (LAP),?FieldManager?104.07 Contractor Obligations,?102.18 Subletting Contract Work to Disadvantaged Business Enterprises (DBEs),?208 - Soil Erosion and Sedimentation Control (NPDES)]
Revised to reflect removal of CPE process and reference Notice of Non-Compliance Process. Compare Here
07/10/2023
Division 3
Division 3 Supplemental Information
Removed outdated information on MICHIGAN CERTIFIED AGGREGATE TECHICIAN PROGRAM TRANSITION. Compare Here
07/10/2023
Division 1
102.01 Contractor Performance Evaluations
Added examples of PDF approval stamps. Compare Here
07/10/2023
Division 1 Supplemental
Wage Rate Interviews
Added example pdf stamp approval. Compare Here
07/10/2023
Division 1 Supplemental
E-Signature
Added clarification on Pay Estimate Signature process View Here
6/20/2023
Sidebar
Documentation Guide 2023
Updated Documentation Guide June 2023 View Here
06/06/2023
Division 1
DOCUMENTING_PRICE_NEGOTIATIONS
Updated for FHWA Risk Based Project Involvement. Compare Here
04/06/2023
Division 1 Supplemental
Wage Rate Interviews
Added/clarified pdf stamp approval directive and not the use of OneSpan. Compare Here
03/08/2023
Division 1
104.10 Claim for Extra Compensation or Extension of Time
Updated contact info for MDOT Construction Contracts Engineer. Compare Here
03/07/2023
Division 1
103.02 Contract Revisions
Updated Flow Chart for Contract Modifications approval for FHWA RBPI process. View Here
02/16/2023
Division 1 Supplemental
Certified Engineer List
Updated Certified Engineer list to February 2023. View Here
02/07/2023
Division 1 Supplemental
Project with Consultant Oversight
Updated language used. Compare Here
12/01/2022
Division 1 Supplemental
e-Construction
Updated alpha/numeric standard naming convention lists as of 11/30/2022 View Here
11/10/2022
Division 1
109.05 Payment for Contract Revisions
Added clarification of acceptable documentation for Force Account Labor on State Funded projects with no Federal Prevailing Wages. Compare Here
10/18/2022
Division 1
Preconstruction Meeting
Added verbiage stating preconstruction meetings must not be conducted prior to award of the project. Compare Here
10/05/2022
Division 8
811 Permanent Pavement Markings
Updated Permanent Pavement Markings payment table to include 2022 prices Compare Here

?

?

?

?


This email was sent to [email protected] using GovDelivery Communications Cloud on behalf of: Michigan DOT ? 425 W. Ottawa St. ? Lansing, MI 48909 ? 517-373-2090