Updated |
Division |
Section |
Summary |
What Changed |
9/26/2023 |
Division 8 |
823 - Water Mains |
Added new content to previously empty Section 823 with pictures, video, and re-format to new Construction Manual style. |
Compare Here |
9/25/2023 |
Division 10 |
Division 10 - Mix Designs |
Created entire New Division of Construction Manual for Division 10 - Mix Designs with links to Standard Specifications for 1001 - Concrete Production Equipment and Facilities, 1002 - Contractor Quality Control for Concrete, 1003 - Quality Assurance (Acceptance) for Concrete, 1004 - Portland Cement Concrete Mixtures, 1005 - Mortar and Grout Mixtures, and 1006 - Patching, Repair, & Overlay Mixtures. |
Compare Here |
9/25/2023 |
Division 9 |
Division 9 - Materials |
Created entire New Division of Construction Manual for Division 9 Materials with links to Standard Specifications for each of the 23 Sections. |
Compare Here |
09/20/2023 |
Division 1 Supplemental
|
E-Signature |
Added clarification for Stamp approval of 0582B Moisture & Density Determination form. Also created?Frequently Asked Signature Questions?Section on page with signature clarification on 1302, 0501, 1100A, 1165 and 0582B forms |
View Here |
9/11/2023 |
Division 1
|
105.10 - Buy America Source of Steel and Iron |
Removal of CFS maintained Buy America certification process. |
Compare Here |
9/7/2023 |
Division 5 |
501 - Plant Produced Hot Mix Asphalt |
Updated contents of entire section 501 with pictures, video, and re-format to new Construction Manual style. |
Compare Here |
9/5/2023 |
Division 8 |
810 - Permanent Traffic Signs and Supports |
Updated contents of entire section 810 with pictures, video, and re-format to new Construction Manual style. |
Compare Here |
8/30/2023 |
Division 8 |
820 - Traffic Signals |
Clarification on payment for signal work. |
Compare Here |
8/9/2023 |
Division 1 |
109.07 - Construction Progress Pay Estimate Approval Process |
Updated contents of entire section 109.07 to reflect removal of digital signature requirements on Pay Estimates and add examples of PDF approval stamps |
Compare Here |
7/18/2023 |
Division 1 |
105 - Structural Fabrication Quality Manual |
Updated content on Structural Fabrication Quality Manual for 2023 version 3 release. |
Compare Here |
07/13/2023 |
Division 1 |
102.19 - Evaluation of Contractor Performance and Contract Non-Compliance |
New Section added for Evaluation of Contractor Performance and Contract Non-Compliance |
Compare Here |
07/13/2023 |
Division 1 |
102.01 - Prequalification of Bidders |
Removal of Contractor Performance Evaluation (CPE) process and replacement with?1165 Notice of Non-Compliance Process?for trunkline projects. |
Compare Here |
06/06/2023 |
Division 1 |
103.02 - Contract Revisions |
Updated guidance for electronic stamp approvals, AASHTOware software, Supporting Documentation for Extra work, & updated flow chart. Also the threshold for Original Pay Item increase or decrease changed from $25k to $50k |
Compare Here |
05/24/2023 |
Division 1 Supplemental |
Prevailing Wage |
Updated Jobsite Posters |
View Here |
05/18/2023 |
Division 1 |
107.06 - Furnishing Right-of-Way |
New Content added for Contractor Requests to break Limited Access Right-of-Way (LAROW) on Interstates |
Compare Here |
05/17/2023 |
Division 2 |
204 - Removing Miscellaneous Structures and Materials |
Updated language for Vertical Exploratory Investigation for Relocation section |
Compare Here |
04/18/2023 |
Division 2 |
208 - Soil Erosion and Sedimentation Control (NPDES) |
Added link to MDOT SESC Pocket Guide |
Compare Here |
04/18/2023 |
Division 1 Supplemental |
FieldManager |
Updated IDR requirements to replace digital signature with PDF stamp |
Compare Here |
04/14/2023 |
Division 1 Supplemental |
Certified Engineer Process |
Updated Certified Engineer Process |
Compare Here |
03/20/2023 |
Division 1 Supplemental |
E-Signature |
Updated MDOT Digital Signatures Guidance for One-Span |
View Here |
03/20/2023 |
Division 1 Supplemental |
Preconstruction Meeting |
Updated Trunk Line and Local Agency Program Boilerplate Preconstruction Meeting Minutes - 2023 |
View Here |
03/08/2023 |
Division 1 |
108.09 - Request for Time Extensions on Work Day, Calendar Day, and Calendar Date Contracts |
Updated content for Extension of Time for Work Day, Calendar Day and Calendar Date Contracts and moved content from 108.07 to 108.09. |
Compare Here |
10/17/2022 |
Division 1 Supplemental |
Construction Field Services Indirect Testing Charges |
Updated content with FY2023 Program Numbers |
View Here |
10/11/2022 |
Division 1 |
104 - Construction Value Engineering Change Proposal (VECP) |
Updated content for Construction Value Engineering Change Proposal (VECP). |
Compare Here |
10/11/2022 |
Division 8 |
820 - Traffic Signals |
Added new Acceptance of Traffic Signal Work content, including pay item list and form. |
View Here |
9/19/2022 |
Division 1 Supplemental |
FHWA Risk-Based Project Involvement |
Updated content to remove references to FHWA Projects of Division Interest (PoDI) and replaced with FHWA Risk-Based Project Involvement (RBPI). References now link to the FHWA Risk-Based Project Involvement (RBPI) Stewardship & Oversight Plan (S&O Plan) page which contains instructions on how to locate each project's S&O Plan in ProjectWise to determine FHWA involvement. |
View Here |