RE: Add New Construction Restrictions #206, #207 and #208, 2023 #206-2023 Restrict permits to No Permits on I-69 NB to I-94 WB Ramp. north of Marshall, Calhoun Co. (Eff. 8/11/2023) #207, 2023 Restrict permitted loads to11 Feet Wide on I-75BL from US-2 to Ferry Ln, ALL LOADS OVER 11' WIDE MUST GET A WAIVER FROM NEWBERRY TSC 906 293-5168 OR MIKE LUSK 906 287-0951, St. Ignace, Mackinac Co. (Eff 8/1/2023 #208, 2023 Restrict permitted loads to 13 Feet Wide on I-94 EB from Exit 29 Pipestone Rd to US-31 Berrien Co. (Eff. 8/2/2023) RE: Revised restrictions #88, #89 and #108, 2023 #88 '23 RESTRICTS LOADS TO 11' WIDE ON I-75 NB FROM EXIT 344A (US-2 /I-75 BL) TO OLD PORTAGE RD. MUST RAMP OFF /RAMP ON AT EXIT 344 A. ALL LOADS OVER 11' WIDE MUST GET A WAIVER FROM NEWBERRY TSC 906 293-5168 OR MIKE LUSK 906 287-0951, (EFF. MAY '23, REV. 7/28/23) (REV 8/1/2023) #89-2023 - RESTRICT LOADS TO 11' WIDE ON SB I-75 FROM OLD PORTAGE RD TO DENSMORE RD, ALL LOADS OVER 11' WIDE MUST GET WAIVER FROM NEWBERRY TSC 906 293-5168 OR MIKE LUSK 906 287-0951, MACKINAC CO (EFF 04/26/2023), (REV. 7/28/23) (REV 8/1/2023) #108 '23 RESTRICTS LOADS TO 11' WIDE ON US-2 FROM BOULEVARD DR. TO I-75BL ST. IGNACE. MACKINAC CO. ALL LOADS OVER 11 FEET WIDE MUST GET WAIVER FROM NEWBERRY TSC 906 293-5168 OR MIKE LUSK 906 287-0951 RE: Remove Restriction #185, 2023 #185 '23 RESTRICTS LOADS TO 11' WIDE ON US-31/M-37 FROM RENNIE SCHOOL RD. TO VANCE RD., CHUMS CORNER CLOSED TO E/W TRAFFIC, (EFF 7/16/23) Construction Restrictions: https://mdotjboss.state.mi.us/APSWB/APBHome.htm?bulletin=active
|