From MaineDOT <[email protected]>
Subject Frank J. Wood Bridge Replacement Construction
Date July 26, 2023 7:40 PM
  Links have been removed from this email. Learn more in the FAQ.
  Links have been removed from this email. Learn more in the FAQ.
Having trouble viewing this email? View it as a Web page [ [link removed] ]. | You are subscribed to MaineDOT News Releases

For More Information:
Paul Merrill, Public Information Officer - 207-624-3355 or 207-215-9297

________________________________________________________________________

Frank J. Wood Bridge Replacement Construction [ [link removed] ] 07/26/2023 03:30 PM EDT

BRUNSWICK/TOPSHAM - The Maine Department of Transportation has begun on-site construction on the project to replace the Frank J. Wood Bridge. The bridge carries Route 201 over the Androscoggin River between Brunswick and Topsham.

The existing bridge is more than 90 years old. It is fracture critical and rated in poor condition. Since November 2021, MaineDOT has prohibited all commercial traffic from using the current bridge. While bridges are normally inspected every two years, the Frank J. Wood bridge is inspected every six months to allow for more frequent analysis of its condition and the potential need for further traffic or weight restrictions.

The replacement bridge will improve safety and reliability for the surrounding communities. The new bridge will be located on a curved upstream alignment and will feature enhancements requested by a local design advisory committee. Designed to last for at least 100 years, the new bridge will have sidewalks on both sides (including pedestrian viewing bump-outs), wider shoulders on both sides, parks on both ends, special railings, lighting and other design details, and unobstructed views of the natural and architectural features of the surrounding Pejepscot Falls site.

Subject to inspections and restrictions of the existing bridge, the new bridge project is not expected to have any significant impacts to motorists until 2025. If the work proceeds as planned, all work associated with the construction contract is scheduled to be finished in late 2026, but the new bridge is expected to be open to traffic earlier than that.

The contractor on this project is Reed & Reed, Inc. of Woolwich. The contract amount is $49,869,767.

###

body { font-size: 1em; font-family: Arial, Verdana, sans-serif; font-weight: normal; font-style: normal; color: #333333; } ________________________________________________________________________

"A free service provided to you by" MaineDOT [ [link removed] ]
   Questions ? Contact Us [ [link removed] ]

STAY CONNECTED:   Sign up for email updates [ [link removed] ] [ [link removed] ]   Visit us on Facebook [ [link removed] ]  Bookmark and Share [ [link removed] ]

SUBSCRIBER SERVICES:
Manage Preferences [ [link removed] ]  |  Unsubscribe [ [link removed] ]  |  Help [ [link removed] ]

MAINEDOT.GOV:
MaineDOT Website [ [link removed] ]

MAINE.GOV:
The official website of the State of Maine Home [ [link removed] ]  |  Online Services [ [link removed] ]  |  Privacy Policy [ [link removed] ]

________________________________________________________________________

This message was sent to [email protected] by Maine.gov the official website for the State of Maine · 45 Commerce Drive, Suite 10 · Augusta, ME 04330 · 1-877-212-6500 GovDelivery logo [ [link removed] ]
Screenshot of the email generated on import

Message Analysis