- Monday 24 April - Friday 9 June: Lane closure on Aspley Lane, Bobber's Mill Bridge, Nuthall Road
- Tuesday 9 May - Friday 30 June: 3-way temporary signals and off-peak road closures as required at junction of A453 Queens Drive/Riverside Way
-
Monday 22 May - Friday 29 September: Closure of Right of Way between Farnborough Road across the field to the Railway Bridge, Silverdale Walk Clifton for Cadent gas works
- Tuesday 30 May - Monday 5 June: Lane closure on Radford Road between Reigate Road and Silverdale Road outbound for emergency gasworks
- Thursday 1 June - Monday 5 June: Lane closure on Nuthall Road for Severn Trent water works
- 3 & 4 June, 10 & 11 June and 17 & 18 June: Weekend closures of Hooton Street exit onto Carlton Road - see below
- Sunday 4 June: 3-way lights on Briarwood Road at junction with Porchester Road for Severn Trent water works
- Sunday 4 June 9am - 4pm: 2-way lights outside 28 Haydn Road for Severn Trent water works
- Sunday 4 June - Monday 5 June 7pm - 6am: Lane closure on Mansfield Road for Severn Trent water works
-
Monday 5 June 7pm - 11pm: Lane closure on Mansfield Road northbound at A60 Mansfield Road junction with Woodthorpe Drive for traffic signal repair works
- Friday 9 June 9.30am - 3pm: 2-way on Bestwood Park Drive West to repair defective manhole cover
- Saturday 10 June - Sunday 11 June: 3-way lights at entrance to Thane Road for Severn Trent water works
- Saturday 10 June - Thursday 15 June: 3-way lights at Woodborough Road junction of Wells Road for National Grid works
- Sunday 11 June 8am - 4pm: 3-way lights opposite 50 Huntingdon Street for Severn Trent water works
- Sunday 11 June 8am - 4pm: Lane closure on Mansfield Road opposite Woodthorpe Grange for Severn Trent water works
Cadent are completing a programme of gasworks across the city this summer. See what is happening near you by putting in your postcode here
Ongoing Streets for People works are taking place around the city - see what's happening near you here
Roadworks begin Monday 5 May on St Ann's Well Road
Roadworks kick off on Monday 5 June on St Ann's Well Road, for safety works including removing and replacing three raised level crossings. These works should cause minimal disruption, with road closures on 2 and 16 July and 13 August.
|
Weekend closures of Hooton Street exit onto Carlton Road, St Ann's as phase one of Carlton Road cycle path nears completion
3 & 4 June, 10 & 11 June and 17 & 18 June
Hooton Street will be closed to provide safe working access while the new cycle path on Carlton Road is finished. Motorists may enter Hooton Street as normal but cannot leave it via the usual exit. Instead, Hooton Street beyond Key Street becomes two-way with motorists able to exit via Key Street and Windmill Lane.
|
City Hospital - road closures
Road closures within the City Hospital campus will impact the 40 bus.
- North Road closed Saturday 3 June - Sunday 4 June.
- North road closed Saturday 10 June - Sunday 11 June.
Service Disruption information
Strikes and engineering works on local train services
- Strike action is planned on East Midlands Railways on Friday 2 June (very limited service) and Saturday 3 June (no service) - read more about the strikes here
- Strike action is planned on Cross Country trains on Saturday 3 June with a very limited service on Friday 2 June - read more here
- Please check before you leave if you plan to travel by any train operator on Friday 2 June or Saturday 3 June
- Planned engineering works are continuing through June with changes coming up to services to Matlock, Derby, London and Sheffield. Check the day you plan to travel here
- East Midlands Railways have made timetable changes - see the details here
- There are some late night and early morning changes to the Northern Rail Nottingham - Leeds service from 10-16 June
|