20003-214-ER-22 |
17072 |
29211 |
4/3/2023 |
Cheyenne Light, Fuel and Power Co. |
IN THE MATTER OF THE APPLICATION OF CHEYENNE LIGHT, FUEL AND POWER COMPANY D/B/A BLACK HILLS ENERGY FOR A GENERAL RATE INCREASE OF $15,366,026 PER ANNUM AND AUTHORITY TO REVISE ITS POWER COST ADJUSTMENT MECHANISM |
Memorandum Opinion and Order Approving Stipulation and Agreement with Modification |
10008-50-CC-20 |
15525 |
29212 |
4/4/2023 |
Niobrara Electric Association, Inc. |
IN THE MATTER OF NIOBRARA ELECTRIC ASSOCIATION, INC.'S COMPLAINT AGAINST ROCKY MOUNTAIN POWER FOR UNAUTHORIZED DELIVERY OF ELECTRICITY INTO NIOBRARA ELECTRIC ASSOCIATION, INC.'S CERTIFICATED TERRITORY AND FOR VIOLATION OF W.S. § 37-2-205(a) |
Letter Order |
20000-583-EC-20 |
15525 |
29212 |
4/4/2023 |
Rocky Mountain Power |
IN THE MATTER OF NIOBRARA ELECTRIC ASSOCIATION, INC.'S COMPLAINT AGAINST ROCKY MOUNTAIN POWER FOR UNAUTHORIZED DELIVERY OF ELECTRICITY INTO NIOBRARA ELECTRIC ASSOCIATION, INC.'S CERTIFICATED TERRITORY AND FOR VIOLATION OF W.S. § 37-2-205(a) |
Letter Order |
10015-86-CT-22 |
17077 |
29213 |
4/4/2023 |
High West Energy, Inc. |
IN THE MATTER OF THE APPLICATION OF HIGH WEST ENERGY, INC., FOR AUTHORITY TO REVISE ITS GRID ACCESS CHARGES FOR SERVICES GREATER THAN 37.5 kVa AND TO CHANGE THE HOURS ASSOCIATED WITH ON PEAK DELIVERY AND PRODUCTION CHARGES FOR THE TIME OF DAY IRRIGATION TARIFF |
Order |
30016-103-GP-23 |
17220 |
29214 |
4/6/2023 |
Pinedale Natural Gas, Inc. |
IN THE MATTER OF THE APPLICATION OF PINEDALE NATURAL GAS, INC., FOR AUTHORITY TO IMPLEMENT AN EMERGENCY GAS COST RECONCILIATION SURCHARGE OF $0.200 PER THERM |
Notice and Order |
20000-631-EN-23 |
17236 |
29215 |
4/6/2023 |
Rocky Mountain Power |
IN THE MATTER OF THE NOTIFICATION AND APPLICATION OF ROCKY MOUNTAIN POWER REQUESTING WAIVER OR ISSUANCE OF A NON-SITUS CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY AND WAIVER OR APPROVAL UNDER THE ADVANCED REVIEW PROCESS FOR THE ENERGY GATEWAY SEGMENT H, BOARDMAN-TO-HEMINGWAY 500-KILOVOLT TRANSMISSION LINE |
Order Granting Motion for Admission Pro Hac Vice |
20000-633-ER-23 |
17252 |
29216 |
4/6/2023 |
Rocky Mountain Power |
IN THE MATTER OF THE APPLICATION OF ROCKY MOUNTAIN POWER FOR AUTHORITY TO INCREASE ITS RETAIL ELECTRIC SERVICE RATES BY APPROXIMATELY $140.2 MILLION PER YEAR OR 21.6 PERCENT AND TO REVISE THE ENERGY COST ADJUSTMENT MECHANISM |
Order Authorizing Intervention |
20000-633-ER-23 |
17252 |
29217 |
4/6/2023 |
Rocky Mountain Power |
IN THE MATTER OF THE APPLICATION OF ROCKY MOUNTAIN POWER FOR AUTHORITY TO INCREASE ITS RETAIL ELECTRIC SERVICE RATES BY APPROXIMATELY $140.2 MILLION PER YEAR OR 21.6 PERCENT AND TO REVISE THE ENERGY COST ADJUSTMENT MECHANISM |
Special Order Authorizing One Commissioner and/or One Presiding Officer to Conduct Public Hearing |
10014-228-CK-23 |
17251 |
29218 |
4/6/2023 |
Powder River Energy Corporation |
IN THE MATTER OF POWDER RIVER ENERGY CORPORATION'S INTER-SYSTEM AGREEMENT FOR EXCHANGE OF ELECTRICAL POWER BETWEEN POWDER RIVER ENERGY CORPORATION AND BLACK HILLS ELECTRIC COOPERATIVE, INC. |
Letter Order |
20000-635-EK-23 |
17259 |
29219 |
4/6/2023 |
Rocky Mountain Power |
IN THE MATTER OF THE POWER PURCHASE AGREEMENT BETWEEN ROCKY MOUNTAIN POWER, A DIVISION OF PACIFICORP, AND ANTICLINE WIND, LLC |
Letter Order |
20000-631-EN-23 |
17236 |
29220 |
4/7/2023 |
Rocky Mountain Power |
IN THE MATTER OF THE NOTIFICATION AND APPLICATION OF ROCKY MOUNTAIN POWER REQUESTING WAIVER OR ISSUANCE OF A NON-SITUS CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY AND WAIVER OR APPROVAL UNDER THE ADVANCED REVIEW PROCESS FOR THE ENERGY GATEWAY SEGMENT H, BOARDMAN-TO-HEMINGWAY 500-KILOVOLT TRANSMISSION LINE |
Order Denying Waiver, Granting Petition and Issuing Protective Order |
10016-78-CT-23 |
17261 |
29221 |
4/7/2023 |
Wyrulec Company |
IN THE MATTER OF APPLICATION OF WYRULEC COMPANY FOR AUTHORITY TO REVISE ITS TARIFFS RELATING TO EV CHARGING STATIONS; SINGLE-PHASE AND THREE-PHASES GENERAL SERVICES; SINGLE-PHASE AND LARGE IRRIGATION SERVICES; AND LARGE POWER SERVICES |
Suspension Order |
20000-632-ET-23 |
17244 |
29222 |
4/7/2023 |
Rocky Mountain Power |
IN THE MATTER OF THE APPLICATION OF ROCKY MOUNTAIN POWER FOR APPROVAL OF A 3-YEAR DEMAND SIDE MANAGEMENT PLAN AND FOR AUTHORITY TO ADJUST RATES IN TARIFF SCHEDULE 191 |
Order Authorizing Intervention |
30016-104-GP-23 |
17273 |
29223 |
4/10/2023 |
Pinedale Natural Gas, Inc. |
IN THE MATTER OF THE APPLICATION OF PINEDALE NATURAL GAS, INC. TO PASS ON A WHOLESALE GAS COST DECREASE OF $0.228 PER THERM AND TO REDUCE THE EMERGENCY GAS COST RECONCILIATION SURCHARGE BY $0.10 PER THERM |
Suspension Order |
10014-229-CT-23 |
17274 |
29224 |
4/10/2023 |
Powder River Energy Corporation |
IN THE MATTER OF THE APPLICATION OF POWDER RIVER ENERGY CORPORATION FOR AUTHORITY TO REVISE ITS RULES AND REGULATIONS TO ESTABLISH METER EQUIPMENT CLEARANCE REQUIREMENTS TO PREVENT INTERFERENCE WITH MAINTENANCE AND TESTING ACTIVITIES, REVISE ITS NON-INDUSTRIAL LINE EXTENSION POLICY TO PROVIDE FOR THE COLLECTION OF COSTS INCURRED UP TO THE POINT OF CANCELLATION, AND REVISE ITS METER TESTING AND VERIFICATION PROGRAM CONSISTENT WITH THE TRANSITION TO AN AMI METER AND COMMUNICATION SYSTEM |
Suspension Order |
10008-56-CT-23 |
17268 |
29230 |
4/10/2023 |
Niobrara Electric Association, Inc. |
IN THE MATTER OF THE APPLICATION OF NIOBRARA ELECTRIC ASSOCIATION, INC., FOR AUTHORITY TO REVISE ITS HIGH LOAD ESCORT TARIFF AND STREET AND HIGHWAY LIGHTING TARIFF |
Suspension Order |
10008-56-CT-23 |
17268 |
29231 |
4/10/2023 |
Niobrara Electric Association, Inc. |
IN THE MATTER OF THE APPLICATION OF NIOBRARA ELECTRIC ASSOCIATION, INC., FOR AUTHORITY TO REVISE ITS HIGH LOAD ESCORT TARIFF AND STREET AND HIGHWAY LIGHTING TARIFF |
Notice of Application |
20003-218-EK-23 |
17224 |
29232 |
4/10/2023 |
Cheyenne Light, Fuel and Power Co. |
IN THE MATTER OF THE CONFIDENTIAL CONTRACT FILING OF THE ENERGY PURCHASE AGREEMENT BETWEEN CHEYENNE LIGHT, FUEL AND POWER COMPANY d/b/a BLACK HILLS ENERGY AND ROUNDHOUSE RENEWABLE ENERGY II, LLC AND THE ASSOCIATED LARGE POWER CONTRACT SERVICE TARIFF CONFIRMATION BETWEEN MICROSOFT AND CHEYENNE LIGHT, FUEL AND POWER COMPANY |
Letter Order |
20000-633-ER-23 |
17252 |
29233 |
4/10/2023 |
Rocky Mountain Power |
IN THE MATTER OF THE APPLICATION OF ROCKY MOUNTAIN POWER FOR AUTHORITY TO INCREASE ITS RETAIL ELECTRIC SERVICE RATES BY APPROXIMATELY $140.2 MILLION PER YEAR OR 21.6 PERCENT AND TO REVISE THE ENERGY COST ADJUSTMENT MECHANISM |
Order Authorizing Intervention |
20003-220-ET-23 |
17270 |
29234 |
4/10/2023 |
Cheyenne Light, Fuel and Power Co. |
IN THE MATTER OF THE APPLICATION OF CHEYENNE LIGHT, FUEL AND POWER DBA BLACK HILLS ENERGY TO REVISE TO THE DEMAND SIDE MANAGEMENT SURCHARGE RATE |
Notice of Application |
20003-220-ET-23 |
17270 |
29235 |
4/10/2023 |
Cheyenne Light, Fuel and Power Co. |
IN THE MATTER OF THE APPLICATION OF CHEYENNE LIGHT, FUEL AND POWER DBA BLACK HILLS ENERGY TO REVISE TO THE DEMAND SIDE MANAGEMENT SURCHARGE RATE |
Suspension Order |
20000-633-ER-23 |
17252 |
29236 |
4/10/2023 |
Rocky Mountain Power |
IN THE MATTER OF THE APPLICATION OF ROCKY MOUNTAIN POWER FOR AUTHORITY TO INCREASE ITS RETAIL ELECTRIC SERVICE RATES BY APPROXIMATELY $140.2 MILLION PER YEAR OR 21.6 PERCENT AND TO REVISE THE ENERGY COST ADJUSTMENT MECHANISM |
Order Granting Motion for Admission Pro Hac Vice |
20000-633-ER-23 |
17252 |
29237 |
4/10/2023 |
Rocky Mountain Power |
IN THE MATTER OF THE APPLICATION OF ROCKY MOUNTAIN POWER FOR AUTHORITY TO INCREASE ITS RETAIL ELECTRIC SERVICE RATES BY APPROXIMATELY $140.2 MILLION PER YEAR OR 21.6 PERCENT AND TO REVISE THE ENERGY COST ADJUSTMENT MECHANISM |
Order Authorizing Intervention |
20000-633-ER-23 |
17252 |
29238 |
4/10/2023 |
Rocky Mountain Power |
IN THE MATTER OF THE APPLICATION OF ROCKY MOUNTAIN POWER FOR AUTHORITY TO INCREASE ITS RETAIL ELECTRIC SERVICE RATES BY APPROXIMATELY $140.2 MILLION PER YEAR OR 21.6 PERCENT AND TO REVISE THE ENERGY COST ADJUSTMENT MECHANISM |
Order Authorizing Intervention |
20000-633-ER-23 |
17252 |
29239 |
4/10/2023 |
Rocky Mountain Power |
IN THE MATTER OF THE APPLICATION OF ROCKY MOUNTAIN POWER FOR AUTHORITY TO INCREASE ITS RETAIL ELECTRIC SERVICE RATES BY APPROXIMATELY $140.2 MILLION PER YEAR OR 21.6 PERCENT AND TO REVISE THE ENERGY COST ADJUSTMENT MECHANISM |
Order Authorizing Intervention |
20002-123-EA-22 |
17028 |
29240 |
4/10/2023 |
Black Hills Power, Inc. d/b/a Black Hills Energy |
IN THE MATTER OF CHEYENNE LIGHT, FUEL AND POWER COMPANY AND BLACK HILLS POWER, INC., dba BLACK HILLS ENERGY TO ESTABLISH INTERMEDIATE LOW-CARBON ENERGY PORTFOLIO STANDARDS AND REQUIREMENTS |
Letter Order |
20003-209-EA-22 |
17028 |
29240 |
4/10/2023 |
Cheyenne Light, Fuel and Power Co. |
IN THE MATTER OF CHEYENNE LIGHT, FUEL AND POWER COMPANY AND BLACK HILLS POWER, INC., dba BLACK HILLS ENERGY TO ESTABLISH INTERMEDIATE LOW-CARBON ENERGY PORTFOLIO STANDARDS AND REQUIREMENTS |
Letter Order |
20000-636-EK-23 |
17260 |
29241 |
4/10/2023 |
Rocky Mountain Power |
IN THE MATTER OF THE POWER PURCHASE AGREEMENT BETWEEN ROCKY MOUNTAIN POWER, A DIVISION OF PACIFICORP, AND CEDAR SPRINGS IV WIND, LLC |
Letter Order |
20000-633-ER-23 |
17252 |
29242 |
4/11/2023 |
Rocky Mountain Power |
IN THE MATTER OF THE APPLICATION OF ROCKY MOUNTAIN POWER FOR AUTHORITY TO INCREASE ITS RETAIL ELECTRIC SERVICE RATES BY APPROXIMATELY $140.2 MILLION PER YEAR OR 21.6 PERCENT AND TO REVISE THE ENERGY COST ADJUSTMENT MECHANISM |
Order Granting Petition for Confidential Treatment and Protective Order |
20004-162-ET-23 |
17271 |
29243 |
4/11/2023 |
Montana-Dakota Utilities Co. |
IN THE MATTER OF THE APPLICATION OF MONTANA-DAKOTA UTILITIES CO., FOR AUTHORITY TO IMPLEMENT A RATE INCREASE OF $0.15 PER BLOCK FOR A TOTAL OF $0.62 PER BLOCK UNDER THE COMPANY'S OPTIONAL RENEWABLE ENERGY RIDER RATE 15 PROGRAM |
Suspension Order |
20002-126-EA-23 |
17276 |
29244 |
4/11/2023 |
Black Hills Power, Inc. d/b/a Black Hills Energy |
IN THE MATTER OF THE APPLICATION OF BLACK HILLS POWER, INC. DBA BLACK HILLS ENERGY TO ESTABLISH INTERMEDIATE LOW-CARBON PORTFOLIO STANDARDS AND REQUIREMENTS |
Notice of Application |
20003-221-EA-23 |
17275 |
29245 |
4/11/2023 |
Cheyenne Light, Fuel and Power Co. |
IN THE MATTER OF THE APPLICATION OF CHEYENNE LIGHT, FUEL AND POWER COMPANY DBA BLACK HILLS ENERGY TO ESTABLISH INTERMEDIATE LOW-CARBON PORTFOLIO STANDARDS AND REQUIREMENTS |
Notice of Application |
20000-640-EA-23 |
17277 |
29246 |
4/11/2023 |
Rocky Mountain Power |
IN THE MATTER OF THE APPLICATION OF ROCKY MOUNTAIN POWER TO ESTABLISH INTERMEDIATE LOW-CARBON PORTFOLIO STANDARDS AND REQUIREMENTS |
Notice of Application |
20000-629-EC-23 |
17227 |
29247 |
4/12/2023 |
Rocky Mountain Power |
IN THE MATTER OF THE FORMAL COMPLAINT OF JENIENE MARIE CRAIN AGAINST ROCKY MOUNTAIN POWER ALLEGING COST FOR REPAIRS DUE TO A FAULTY NET METER BOX RESULTING IN A SMALL FIRE |
Letter Order |
10020-68-CT-22 |
17160 |
29248 |
4/13/2023 |
High Plains Power, Inc. |
IN THE MATTER OF THE APPLICATION OF HIGH PLAINS POWER, INC. FOR AUTHORITY TO REVISE ITS TARIFF TO ADD A RESIDENTIAL PREPAID SERVICE OPTION, UPDATE PAYMENT TERMS, ADD DEMAND AND POWER COST ADJUSTMENT LANGUAGE, RENAME AND UPDATE THE WHOLESALE GENERATION FACILITIES RATE, DISCONTINUE THE SEASONAL RATE, AND UPDATE THE NET METERING RATE |
Notice and Order Setting Public Hearing |
90072-48-XO-21 |
15684 |
29249 |
4/13/2023 |
General Order Sub Number Designation (WUSF) |
IN THE MATTER OF THE FUNDING REQUIREMENT AND PROPOSED ASSESSMENT FACTOR FOR THE JULY 2021 TO JUNE 2022 FISCAL YEAR OF THE WYOMING UNIVERSAL SERVICE FUND |
Memorandum Opinion, Findings and Order |
30026-73-GT-23 |
17269 |
29250 |
4/14/2023 |
Black Hills Wyoming Gas, LLC d/b/a Black Hills Energy |
IN THE MATTER OF THE APPLICATION OF BLACK HILLS WYOMING GAS, LLC D/B/A BLACK HILLS ENERGY FOR AUTHORITY TO INCREASE THE ENERGY EFFICIENCY SURCHARGE BY $0.0044 PER THERM FOR RESIDENTIAL CUSTOMERS AND BY $0.0005 PER THERM FOR NON-RESIDENTIAL CUSTOMERS |
Notice of Application |
30026-73-GT-23 |
17269 |
29251 |
4/14/2023 |
Black Hills Wyoming Gas, LLC d/b/a Black Hills Energy |
IN THE MATTER OF THE APPLICATION OF BLACK HILLS WYOMING GAS, LLC D/B/A BLACK HILLS ENERGY FOR AUTHORITY TO INCREASE THE ENERGY EFFICIENCY SURCHARGE BY $0.0044 PER THERM FOR RESIDENTIAL CUSTOMERS AND BY $0.0005 PER THERM FOR NON-RESIDENTIAL CUSTOMERS |
Suspension Order |
10014-229-CT-23 |
17274 |
29252 |
4/14/2023 |
Powder River Energy Corporation |
IN THE MATTER OF THE APPLICATION OF POWDER RIVER ENERGY CORPORATION FOR AUTHORITY TO REVISE ITS RULES AND REGULATIONS TO ESTABLISH METER EQUIPMENT CLEARANCE REQUIREMENTS TO PREVENT INTERFERENCE WITH MAINTENANCE AND TESTING ACTIVITIES, REVISE ITS NON-INDUSTRIAL LINE EXTENSION POLICY TO PROVIDE FOR THE COLLECTION OF COSTS INCURRED UP TO THE POINT OF CANCELLATION, AND REVISE ITS METER TESTING AND VERIFICATION PROGRAM CONSISTENT WITH THE TRANSITION TO AN AMI METER AND COMMUNICATION SYSTEM |
Notice of Application |
20000-634-EK-23 |
17256 |
29253 |
4/14/2023 |
Rocky Mountain Power |
IN THE MATTER OF THE CONFIDENTIAL CONTRACT FILING OF ROCKY MOUNTAIN POWER FOR THE ACCEPTANCE OF THE POWER PURCHASE AGREEMENT WITH TWO RIVERS WIND, LLC |
Letter Order |
20002-127-ET-23 |
17278 |
29254 |
4/14/2023 |
Black Hills Power, Inc. d/b/a Black Hills Energy |
IN THE MATTER OF THE APPLICATION OF CHEYENNE LIGHT, FUEL AND POWER COMPANY AND BLACK HILLS POWER, INC. d/b/a BLACK HILLS ENERGY TO ESTABLISH A LOW-CARBON SURCHARGE RATE AND A LOW-CARBON SURCHARGE TARIFF |
Notice of Application |
20003-223-ET-23 |
17278 |
29254 |
4/14/2023 |
Cheyenne Light, Fuel and Power Co. |
IN THE MATTER OF THE APPLICATION OF CHEYENNE LIGHT, FUEL AND POWER COMPANY AND BLACK HILLS POWER, INC. d/b/a BLACK HILLS ENERGY TO ESTABLISH A LOW-CARBON SURCHARGE RATE AND A LOW-CARBON SURCHARGE TARIFF |
Notice of Application |
20002-127-ET-23 |
17278 |
29255 |
4/14/2023 |
Black Hills Power, Inc. d/b/a Black Hills Energy |
IN THE MATTER OF THE APPLICATION OF CHEYENNE LIGHT, FUEL AND POWER COMPANY AND BLACK HILLS POWER, INC. d/b/a BLACK HILLS ENERGY TO ESTABLISH A LOW-CARBON SURCHARGE RATE AND A LOW-CARBON SURCHARGE TARIFF |
Suspension Order |
20003-223-ET-23 |
17278 |
29255 |
4/14/2023 |
Cheyenne Light, Fuel and Power Co. |
IN THE MATTER OF THE APPLICATION OF CHEYENNE LIGHT, FUEL AND POWER COMPANY AND BLACK HILLS POWER, INC. d/b/a BLACK HILLS ENERGY TO ESTABLISH A LOW-CARBON SURCHARGE RATE AND A LOW-CARBON SURCHARGE TARIFF |
Suspension Order |