From Michigan Dept of Transportation <[email protected]>
Subject Spring 2023 - MDOT Construction Manual Quarterly Updates
Date April 4, 2023 6:16 PM
  Links have been removed from this email. Learn more in the FAQ.
  Links have been removed from this email. Learn more in the FAQ.
? MDOT E-mail

Having trouble viewing this email? View it as a Web page [ [link removed] ].

Bookmark and Share [ [link removed] ]



April 2023 ? MDOT Construction Manual Updates

The tables below list all Major and Minor changes to the MDOT Construction Manual in the past several months.??

All changes for the past 12 months can be found in the table of Recent Major Changes [ [link removed] ] and the table of Recent Minor Changes [ [link removed] ]?or can also be found in the Construction Manual [ [link removed] ] on the Main Page.?

Recent Major Changes to the Construction Manual

The table below is a list of Major changes in the last 12 months.

Updated Division Section Summary What Changed
3/20/2023

1 Supplemental

E-Signature [ [link removed] ]
Updated MDOT Digital Signatures Guidance for One-Span View Here [ [link removed] ]
03/20/2023

1

102 [ [link removed] ]
Updated Trunk Line and Local Agency Program Boilerplate Preconstruction Meeting Minutes - 2023 View Here [ [link removed] ]
03/08/2023

1

108.09 [ [link removed] ]
Updated content for Extension of Time for Work Day, Calendar Day and Calendar Date Contracts and moved content from 108.07 to 108.09. Compare Here [ [link removed] ]
10/17/2022

1 Supplemental

Construction Field Services Indirect Testing Charges [ [link removed] ]
Updated content with FY2023 Program Numbers View Here [ [link removed] ]
10/11/2022

1

104 [ [link removed](VECP) ]
Updated content for Construction Value Engineering Change Proposal (VECP). Compare Here [ [link removed] ]
10/11/2022

8

820 [ [link removed] ]
Added new Acceptance of Traffic Signal Work content, including pay item list and form. View Here [ [link removed] ]
9/19/2022

1 Supplemental

FHWA Risk-Based Project Involvement [ [link removed](RBPI)_Stewardship_%26_Oversight_Plan_(S%26O_Plan) ]
Updated content to remove references to FHWA Projects of Division Interest (PoDI) and replaced with FHWA Risk-Based Project Involvement (RBPI). References now link to the FHWA Risk-Based Project Involvement (RBPI) Stewardship & Oversight Plan (S&O Plan) page which contains instructions on how to locate each project's S&O Plan in ProjectWise to determine FHWA involvement. View Here [ [link removed](RBPI)_Stewardship_%26_Oversight_Plan_(S%26O_Plan) ]
7/21/2022

1

104.10 [ [link removed] ]
Updated Construction Claims Procedure document with July 2022 version. View Here [ [link removed] ]
6/21/2022

8

811 [ [link removed] ]
Updated temporary special markings price negotiation costs Compare Here [ [link removed] ]
5/18/2022

Sidebar

AASHTOWare Project Construction & Materials Software Manual (Wiki) [ [link removed] ]
Added the AASHTOWare Project Construction & Materials Software Manual (Wiki) to the left sidebar of the Construction Manual Wiki View Here [ [link removed] ]
5/5/2022

8

811 [ [link removed] ]
Updated Durable Pavement Markings and Uniform Price Adjustment, Regular Dry Paint, and Low Temperature Waterborne Paint sections Compare Here [ [link removed] ]

?

Recent Minor Changes to the Construction Manual

The table below is a list of Minor changes in the last 6 months.

Updated Division Section Summary What Changed
03/08/2023

1

104.10 [ [link removed] ]
Updated contact info for MDOT Construction Contracts Engineer. Compare Here [ [link removed] ]
03/07/2023

1

[Contract Revisions [ [link removed] ]]
Updated Flow Chart for Contract Modifications approval for FHWA RBPI process. View Here [ [link removed] ]
02/16/2023

1 Supplemental

Certified Engineer List [ [link removed] ]
Updated Certified Engineer list to February 2023. View Here [ [link removed] ]
02/07/2023

1 Supplemental

Project with Consultant Oversight [ [link removed] ]
Updated language used. Compare Here [ [link removed] ]
12/01/2022

1 Supplemental

e-Construction [ [link removed] ]
Updated alpha/numeric standard naming convention lists as of 11/30/2022 View Here [ [link removed] ]
11/10/2022

1

109.05 [ [link removed] ]
Added clarification of acceptable documentation for Force Account Labor on State Funded projects with no Federal Prevailing Wages. Compare Here [ [link removed] ]
10/18/2022

1

Preconstruction Meeting [ [link removed] ]
Added verbiage stating preconstruction meetings must not be conducted prior to award of the project. Compare Here [ [link removed] ]
10/05/2022

8

811 [ [link removed] ]
Updated Permanent Pavement Markings payment table to include 2022 prices Compare Here [ [link removed] ]
7/20/2022

307

Aggregate Shoulders and Approaches, Measurement and Payment [ [link removed] ]
Updated moisture content change information under Measurement and Payment Compare Here [ [link removed] ]
7/5/2022

1 supplemental

Dispute Review Board [ [link removed](DRB)#Dispute_Review_Board_.28DRB.29 ]
Updated link to public-facing website for DRB and updated pdf file as of July 2022 Compare Here [ [link removed] ]
7/5/2022

1 supplemental

Certified Engineer List [ [link removed] ]
Updated Certified Engineer List to June 2022 View Here [ [link removed] ]
6/30/2022

1

102.02 [ [link removed] ]
Updated lead times for Steel Pipe pile in excess of 14 inches diameter..., Concrete Beams, and added Precast Box Culverts and Ductile Iron Watermain Compare Here [ [link removed] ]
6/7/2022

2

208 [ [link removed](NPDES)#Turbidity_Curtain ]
Added new Turbidity Curtain section View Here [ [link removed](NPDES)#Turbidity_Curtain ]
5/26/2022

1

Process for Documenting Certified Materials in FieldManager [ [link removed] ]
Updated content and added samples Compare Here [ [link removed] ]

?

?

?

?

?

________________________________________________________________________

?

"The Michigan Department of Transportation:?"
"Providing the highest quality integrated transportation services for economic benefit and improved quality of life.?"
"www.michigan.gov/mdot [ [link removed] ]??| ?www.michigan.gov/drive [ [link removed] ]? | ?contact MDOT [ [link removed] ]?
"

?

Manage?Subscriptions [ [link removed] ]??|??Subscriber Help [ [link removed] ]??|??Having trouble viewing this email? View it as a Web page [ [link removed] ].
________________________________________________________________________

This email was sent to [email protected] using GovDelivery Communications Cloud on behalf of: Michigan DOT ? 425 W. Ottawa St. ? Lansing, MI 48909 ? 517-373-2090
Screenshot of the email generated on import

Message Analysis